Laserfiche WebLink
TEMPORARY MEDICAL VACUUM VECA <br /> PUMP ADDITION LOAD SUMMARY ELECTRIC&TECHNOLOGIES <br /> SWBD 4Y1 D 480V,800A kVA AMPS @ <br /> 480V <br /> EXISTING PEAK DEMAND METERED LOAD 72.24 86.89 <br /> +25%PER NEC 220 87 1806 21 72 CONSULTANTS <br /> +NEWADDED CALCULATED LOAD ON PANEL 4YIA 9.64 11.60 <br /> NEWTOTAL LOAD ON SWBD4Y1D 99.95 12022 <br /> AMPS@ EVIDENCE <br /> SW BD 4X1D 480V,225A kVA <br /> 480V EBD <br /> BASED <br /> EXISTING PEAK DEMAND METERED LOAD 16.53 19.88 DESIGN <br /> +25%PER NEC 220.87 4.13 4.97 <br /> +NEWADDED CALCULATED LOAD 0.00 0.00 SE RVIC ES <br /> NEWTOTAL LOAD ON SWBD4X1D 20.66 24.85 <br /> M. <br /> WAS, <br /> SWBD4WID 480V,1200A kVA AMPS@ <br /> 480V <br /> EXISTING PEAK DEMAND METERED LOAD 348.29 418.93 <br /> +25%PER NEC 220.87 87.07 104.73 <br /> 57724�_,,cc00 <br /> +NEWADDED CALCULATED LOAD 000 000 2R1ST1'r�t <br /> 'YS70NAL �' �_,,,�t <br /> NEW TOTAL LOAD ON SWBD4WID 436.36 523.66 11 7v* <br /> MEDICAL VACUUM <br /> SWBD4WBD 480V,1200A kVA AMPS@ 480V PUMP REPLACEMENT <br /> EXISTING PEAK DEMAND METERED LOAD 139.67 168.00 <br /> +25%PER NEC 220 87 3492 4200 <br /> +NEWADDED CALCULATED LOAD 000 000 <br /> PROVIDENCE REGIONAL MEDICAL <br /> NEW TOTAL LOAD ON SWSD4WBD 174.59 210.00 CENTER <br /> PACIFIC CAMPUS <br /> 916 PACIFIC AVE <br /> SWBD 4XBD 480V,800A kVA AMPS@ EVERETT,WA 98201 <br /> 480V <br /> EXISTING PEAK DEMAND METERED LOAD 2993 3600 <br /> +25%PER NEC 220.87 7.48 9.00 <br /> +NEWADDED CALCULATED LOAD 0.00 0.00 <br /> NEWTOTAL LOAD ON SWBD4XBD 37.41 45.00 <br /> SWBD 4YBD 480V,1200A kVA AMPS@ <br /> 480V <br /> EXISTING PEAK DEMAND METERED LOAD 137.18 165.00 <br /> +25%PER NEC 220.87 3400 000 CONSTRUCTION <br /> 125 <br /> +NEW ADDED CALCULATED LOAD 000 000 <br /> NEW TOTAL LOAD ON SWBD4YBD 171.47 206.25 DOCUMENTS <br /> SWBDMSB7 480V,4000A kVA AMPS@ <br /> 480V <br /> EXISTING PEAK DEMAND METERED LOAD 496.77 597.52 <br /> +25%PER NEC 220.87 124.19 149.38 <br /> +NEWADDED CALCULATED LOAD 0.00 0.00 <br /> NEW TOTAL LOAD ON SWBDMSB1 620.96 746.90 <br /> SWBDEG 480V,2500A kVA AMPS@ <br /> 480V <br /> EXISTING PEAK DEMAND METERED LOAD 743.84 894.70 <br /> +25%PER NEC 220.87 0.00 0.00 <br /> +NEWADDED CALCULATED LOAD ON PANEL 4YIA 9.64 11.60 <br /> NEW TOTAL LOAD ON SWBDEG 753.48 906.30 <br /> SWBD EG 480V,2500A kVA AMPS@ <br /> 480V <br /> EXISTING PEAK DEMAND METERED LOAD 743.84 894.70 11112/2024 TEMPORARY MEDICAL VACUUM PUMP <br /> +25%PER NEC 220.87(NOTE 1) 0.00 0.00 - 10/18/2024 CONSTRUCTION DOCUMENTS <br /> MARK DATE DESCRIPTION <br /> +NEWADDED CALCULATED LOAD ON PANEL 4YIA 9.64 11.60 <br /> PROJECT NO:B24-1119 <br /> NEWTOTAL LOAD ON SWBDEG 753.48 906.30 CAD DWG FILE:E14.DWG <br /> DRAWN BY:CRS <br /> NOTE 1:+25%LOAD PER NCE 220.87 INCLUDE IN DOWNSTREAM LOADS. <br /> CHK'D BY:KMD <br /> COPYRIGHT: <br /> SHEET TITLE <br /> LOAD SUMMARIES <br /> ' E1.4 <br />