Laserfiche WebLink
BUILDING AREA: PROJECT INFORMATION: n n <br /> MAIN LEVEL CONDITIONED: 425 S SF OWNER INFORMATION: J AN 0 2 2024 D <br /> MAIN 4257E DAN AND HEATHER HANSEN D EVENED <br /> BASEMENT LEV€L CONDITIONED: 1,727 7E 611 ALVERSON AVENUE <br /> TOTAL CONDITIONED/GROSS FLOOR AREA: 4,0`�75F EVERETT'WA 98201 CITY OF E <br /> E:danlelha sen2l@gmall.com VERET DEC 2023 <br /> Permit Services 1 5 <br /> PROJECT DESCRIPTION: CITY OF EVERETT <br /> ENERGY CODE ANALYSIS: Reconfiguration of the woofing basement level and addition of(3)window wells. Permit Services <br /> Basement to contain 2 bedrooms,2 bathrooms,Family room,Office,Roe room, <br /> FOAMED HEADERS: Laundry room,and Mechanical room. <br /> INTERMEDIATE FRAMED HEADER TO BE INSULATED(RID)-REFER TO 402.1.1 FOR TYPICAL CONDITIONS. SITE ADDRESS: Permit ft: 112311-001 <br /> Alfl BARRIER AND INSULATION: 611 ALVERSON AVENUE,EVERETi WA 98201 <br /> Site Address: 611 ALVERSON BLVD <br /> AIR BARRIEHSANSUTATION LOCATIONS AND REQUIREMENTS PER R402.4.1.1. Owner: HANSEN DAN/HEATHER <br /> PARCEL#: 00458813605000 Tenant: <br /> I <br /> APp•Date: 11/1/2023 <br /> QRwt <br /> CONVERT EXISTING BASEMENT STORAGE INTO HABITABLE SPACE(TOTALING 1,727 SF).THE FOLLOWING ZONE: A-1 RESIDENTIAL PermitType: RESIDENTIAL BUILDING <br /> 1ECOMMODATE FOR THE FOLLOWING CREDITS: Subtype: RESIDENTIAL ALTERATION(REMODEL, <br /> RADIANT HYDRONIC HEAT LEGAL DESCRIPTION: REPAIR,ADDITION) <br /> 1DOW TO HAVE MIN.U-VALUE OF.28 AND CONT.R-10 UNDER ENTIRE BASEMENT SLAB GRANDVIEW ADD TO EVEREIT BLK 136 D-OD-LOTS 50 TO 53INC Description: BASEMENT IT,2 BEDRMS,2 BATHRMS, <br /> 3 TANKLESS WATER HEATEfl WITH MIN.AFUE OF90%TO SUPPLY HYDRONIC SYSTEM FAM.RM,OFFICE,LAUNDRY <br /> 5 TANIO-E77 WATER HEATEfl WITH MIN.AFUE OF 90%TO SUPPLY DOMESTIC HOT WATER <br /> Reviewed By: Date:w <br /> WINDOWS: <br /> NEW WINDOWS SIZED TO BE A MINIMUM 8%OF HABITABLE ROOM FLOOR AREA WITH 4%OPERABLE. LAND USE ANALYSIS: / Office Set _Job Site Set <br /> LIGHTING: SITE AREA: 12,632 FP <br /> NEW RECESSED LUMINAIRES MUST BE TYPE IC AND 75%TO HAVE HIGH-EFFICACY LAMPS. / <br /> LOT COVERAGE(NO CHANGE): 2221 FTr / $aJc..�e'�f <br /> PRESCRIPTIVE REQUIREMENTS: PRIMARY RESIDENCE(IX.): 1199 FR <br /> NI Climate Zone 7aWa R402.1.1 RESIDENCE PORCH(EX.): 158 Fri <br /> GARAGE(EX): 642 Fix <br /> R-Valoa• U-Factor• DECK(EX.): 222 FT° )P I <br /> Fenestration U-Factor° n/a 0.30 (E)PWR, <br /> S II ht U-Factor° n/a 0.50 LOT COVERAGE%: 36.4% POLE <br /> Glared Fenestration SHGC°^ n/a n/a <br /> Ceiling• 49 0.026 IMPERVIOUS AREA: \/ <br /> EA IMPERVIOUS AREA: 3618 FT° <br /> Floor 30 0.029 X. - -- 1 <br /> Wood Frame wall 21 int 0.0 PRIMARY RESIDENCE(ROOF): 1924 Fr° J V <br /> � .,Leal �_ <br /> Below Grade Wall 10/15/21 Irt+TB 0.042 GARAGE BUILDING(ROOF): 698 FP / <br /> Slab•R-Value&Depth 10,2 It n/a DRIVEWAYIWALXWAYS: 596 Fri / I 31 <br /> GRAVEL COURT: 400 FT° <br /> PROPOSED IMPERVIOUS AREA TOTAL: 3492 FF <br /> Q jWHOLE-HOUSE MECHANICALVENTIlATION: EXIST.ROOF AREA TO REMAIN: 2622 rx I C�'Y OF EVERcTT <br /> 1 EMENT LEVEL BETWEEN 1,501 IS <br /> AND 2,000 SF,HANNG 2 BEDROOMS,TO HAVE AN AIR FLOW RATE OF 45 CFM.LAUNDRY FAN IXISL ORIVEYWALK WAYTO REMAIN: 598 / r C O C I�aa��l <br /> E A CONTINUOUSLY PUNNING 50 CFM FAN,MIN. �0 W!t(,m {riyvr 6(aay-Co ro wy(G o•d^f'(oMl, EXIST.GRAVEL REDUCED: 274 FT° / E" N`—' `' ' F'.�/i f T <br /> IMPERVIOUS AREA%: 57.2% / <br /> / I <br /> / I t b J I��it 1�b�P,6Mr V1ot <br /> -to 5e h M ✓ J fi�E space wr-Nn be.(� <br /> oQ�Q� 6 L o•.P rt�l� . w <br /> SITE PLAN a /, i I t L5 0. n�w.vldl a�6 rocs e <br /> SCALE:1•=10' <br /> / <br /> 0 10' 20' 30' P�Jy/ I w <br /> wcli <br /> T <br /> P / / z rn>� I ^ <br /> / v J <br /> / OVERHANG C/) <br /> WALKWAY <br /> LLJ <br /> LU <br /> / / I <br /> / / I**ALL ELECTRICAL,MECHANICAL, / <br /> PLUMBING,FRAMING INSTALLED (E)W.M. / � c I DRAWN: GS <br /> /OR ALTERED WITHOUT PERMITS I I DATE: 2021.11.01 <br /> / <br /> // // I #:OR INSPECTION OR APPROVAL PROJECT 2021.08/ I)MUST BE UNCOVERED FOR SCALE: PER DRAWING/ �/ <br /> / w PHASE <br /> INSPECTION** <br /> PERMIT/CONSTRUCTION <br /> DRAWINGS <br /> OCTOBER 20,2023 <br /> BUILDING PERMIT REVISION 12.10.2023 <br /> / / I <br /> 41 <br /> E)FAIR <br /> POLE :(E)CQI!,DRIVEWAY / /�I AREA OF SITE WORK <br /> I (SEE SHEET 2) <br /> / <br /> I � <br /> PROJECT INFO AND <br /> I <br /> 4 j @� ONC.DAAEWAY I SITE PLAN <br /> I <br /> I I I <br /> SHT. 1 <br />