Laserfiche WebLink
GROUNDING PLAN LEGEND: <br /> eillith <br /> —GROUND WIRE @ COPPER GROUND ROD <br /> • EXOTHERMIC WELD GROUND ROD �.., AT&T <br /> • MECHANICAL CONNECTION $ W/ TEST WELL �� <br /> CELL REFERENCE GROUND BAR: POINT OF GROUND REFERENCE <br /> FOR ALL COMMUNICATIONS EQUIPMENT FRAMES. ALL BONDS ARE <br /> MADE WITH #2 STRANDED GREEN INSULATED COPPER CROWN <br /> CONDUCTORS. BOND TO GROUND RING WITH (2) #2 SOLID <br /> NEW ANTENNA NEW ANTENNA NEW ANTENNA TINNED COPPER CONDUITS (ATT-TP-76416 7.6.7). CL: CASTLE <br /> AND/OR RADIO AND/OR RADIO AND/OR RADIO <br /> EQUIPMENT (SEE EQUIPMENT (SEE EQUIPMENT (SEE HATCH PLATE GROUND BAR: BOND TO THE INTERIOR GROUND <br /> SHEET C-3 FOR SHEET C-3 FOR SHEET C-3 FOR RING WITH (2) #2 STRANDED GREEN INSULATED COPPER 1505 WESTLAKE AVENUE NORTH,SUITE 800 <br /> MODEL AND MODEL AND MODEL AND CONDUCTORS. WHEN A HATCH-PLATE AND A CELL REFERENCE SEATTLE,WA 98109 <br /> QUANTITY) QUANTITY) QUANTITY) GROUND BAR ARE BOTH PRESENT, THE CELL SITE REFERENCE <br /> GROUND BAR MUST BE CONNECTED TO THE HATCH-PLATE AND <br /> 1 TO THE INTERIOR GROUND RING USING (2) #2 STRANDED GREEN 0 <br /> INSULATED COPPER CONDUCTORS. A <br /> I I I EXTERIOR CABLE ENTRY PORT GROUND BARS: LOCATED AT THE O <br /> ENTRANCE TO THE CELL SITE BUILDING. BOND TO GROUND RING <br /> I I I WITH A #2 SOLID TINNED COPPER CONDUCTORS WITH AN P.MARSHALL&ASSOCIATES <br /> Nl 1 1 EXOTHERMIC WELD AND INSPECTION SLEEVE (ATT-TP-76416 <br /> 7.6.7.2). <br /> SECTOR GROUND BAR SECTOR GROUND BAR SECTOR GROUND BAR <br /> T T ♦ DURING ALL DC POWER SYSTEM CHANGES INCLUDING DC SYSTEM <br /> I CHANGE OUTS, RECTIFIER REPLACEMENTS OR ADDITIONS, BREAKER <br /> REPLACEMEENTS N AND INSTALLATONSOORIONS CHANGES TOY DC <br /> I 1 CONVERTER SYSTEMS IT SHALL BE REQUIRED THAT SERVICES S N 0 5 <br /> L Z I - J CONTRACTORS VERIFY ALL DC POWER SYSTEMS ARE EQUIPPED <br /> WITH MASTER DC SYSTEM RETURN GROUND CONDUCTOR FROM <br /> TOWER TOP COLLECTOR GROUND BAR THE DC POWER SYSTEM COMMON RETURN BUS DIRECTLY BU #: 856390 <br /> CONNECTED TO THE CELL SITE REFERENCE GROUND BAR PER PAINE FIELD <br /> - TP76300 SECTION H 6 AND TP76416 FIGURE 7-11 <br /> MIDPOINI GROUND BAH REQUIREMENTS.(AS NEEDED) 1118 BOTH STREET SOUTHWEST <br /> EVERETT, WA 98203 <br /> TOWER EXIT GROUND BAR <br /> I <br /> REV DATE DESCRIPTION <br /> I <br /> T. I <br /> L <br /> T <br /> TOWER GROUND RING A 1/12/22 PRELIMS <br /> 0 3/16/22 FOR CONSTRUCTION <br /> I I 1 4/13/23 FOR CONSTRUCTION <br /> EQUIPMENT GROUND RING -I 2 4/20/23 FOR CONSTRUCTION <br /> T- <br /> EXISTING SHELTER <br /> 1 <br /> 1 <br /> DESIGNED:MSW <br /> I DRAWN: MSW <br /> I 1 %YO(� `t'` '. CHECKED: PWM <br /> I <br /> I JOB#: <br /> INTERIOR SHELTER GROUND LOOPm9 21CCA06M-0040 <br /> L q U&NuumE 604-106-184 <br /> I \ CELL REFERENCE GROUND&R <br /> 1-- T - T- GROUNDING <br /> SCHEMATIC <br /> L +� � I J <br /> GROUNDING SCHEMATIC G-1 <br />