Laserfiche WebLink
• <br /> 4....‘,.....:,, AT&T <br /> ,....„.. <br /> EXISTING AT&T <br /> 12'-0" x 28'-0" <br /> SHELTER <br /> // /i//iiiiiiiiiii/iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiliiiiiiiiiiii/iiiiiiiiii/iiiii/ CROWN <br /> I HALO <br /> EXISTING EXISTING / al170 CASTLE <br /> CNTRLS BATTERIES • <br /> BATTERIES BATTERIES <br /> / 1505 WEST SEATTLE,E WA 98109 <br /> NORTH,SURE 800 <br /> 0 A <br /> . • fXISTIn� RACK EXISTING RACK W/ SIAD, FSM4 (AMIA), RAYCAP <br /> DC12 ( RAYCAP DC6,CONVERTER SYSTEM % O <br /> EXISTING <br /> ON - W/CCU (EMPTY) & ACK MOUNTED SLACK TRAY <br /> +T DC PLANT <br /> EXISTING AT&T ICE BRIDGE (+/-7'-111 <br /> txisITISNG • • • EXISTING � EXISTING <br /> (T1P) P.MARSHALL&ASSOCIATES <br /> EXISTING <br /> COAX PORT CABINET FIF RACK EXISTING LTE FIBER <br /> SLACK BOX (TYP.) <br /> 1 \ <br /> CONCRETE \ EXISTING CABLE 0 0 <br /> PAD DOOR �• _ r <br /> LADDER (TYP.) O EXISTING 0 S N 0 5 <br /> O UMTS <br /> 0 <br /> AC O CABINET <br /> PANEL J-.Box ratio eGARo / BU #: 856390 <br /> �� / EXISTING AT&T FEEDLINES PAINE FIELD <br /> y T// 2//)---} --2, ///f/////////////////////////////// //////////////�/////////////4 = (24) 7/8" COAX CABLES <br /> EX. SERVICE EXISTING DIPLEXERS - (6) #8 AWG DC TRUNKS 1118 80TH STREET SOUTHWEST <br /> DISCONNECT (TYP.) (2) FIBER TRUNK EVERETT, WA 98203 <br /> (1) RET <br /> EXISTING <br /> K DISCONNECT EXISTING EQUIPMENT PLAN <br /> EQUIPMENT LAYOUT SHOWN IS BASED ON THE PREVIOUS �.'"-.... 1"=2-0' (FULL SIZE) <br /> CONSTRUCTION DRAWINGS DONE BY 15C(TE 2 1 0 2' 1°=4'-0' (11x17) REV DATE DESCRIPTION <br /> INFRASTRUCTURE SERVICES DATED 09/17/19 AS WELL CA \• / - <br /> AS MOST RECENT AUDIT PHOTOS AND MEASUREMENTS. A 1/12/22 PRELIMS <br /> IF EQUIPMENT LAYOUT DIFFERS FROM WHAT U SHOWN. <br /> CONTRACTOR TO CONTACT THE CONSTRUCTION MANAGER. 1 0 3/16/22 FOR CONSTRUCTION <br /> IIl t*7 1 4/13/23 FOR CONSTRUCTION <br /> 2 4/20/23 FOR CONSTRUCTION <br /> EXISTING FSM4 (AMIA) - UTIUZE EXISTING (1) ASIA AND (3) ABIA CARDS ON THE Cl SIDE FOR <br /> EXISTING AT&T LSE. REMOVE EXISTING (1)ASIK AND (1) ABIL CARDS ON THE C2 SIDE. ADD (1) ASIL AND (2) <br /> 12'-0.x 28'-0" ABIO CARDS TO THE C2 SIDE FOR 5G 850/1900/AWS, 5G C n77 <br /> SHELTER / //////////////////////////////////////////////////////////////////////////////// //////� - <br /> CHALO EXISTING EXISTTNG <br /> CNTRLS EXISTING BATTERIES BATTERIES / <br /> BATTERIES. . . . . - . . . <br /> I <br /> — - I <br /> PROPOSED SLACK TRAY • <br /> MOUNTED IN THE RACK <br /> FXISTING RACK W/ SIATI, FS1.44 (AMIA), RAYCAP _ <br /> EXISTING RACK DC12 (LTE), RAYCAP DC6,CONVERTER STSILM • <br /> EXISTING EMERSON / EXISTING AT&T ICE BRIDGE (+/-T-11") <br /> +48V DC PLANT W/CCU (EMPTY) & RACK MOUNTED SLACK TRAY <br /> EXISTING <br /> - - EXISTING EXISTING (6) DIPLEXERS • EXISTING <br /> UMTS EXISTING - COAX PORT GPS (TYP.) DESIGNED:MSW <br /> FIF RACK EXISTING LIE FIBER <br /> CABINET \ DRAWN: MSW <br /> \ e x /\ SLACK BOX (TYP.) W. <br /> I \ ,1 G Irk <br /> 1. CHECKED: PWM <br /> CONCRETE <br /> \\ EXISTING CABLE O I 0 0 /'♦..♦♦.��`>,♦. •',' <br /> DOOR LADDER (TYP.) 0 EXISTING •♦♦♦♦♦•♦•♦♦♦•♦♦.•♦♦♦♦ o�si ti 9 JOB#: <br /> O <br /> UMTS • • 21CCAO6M 0040 <br /> CABINET <br /> PROPOSED LTE FIBER SLACK BOX <br /> IL <br /> AC PROPOSED AT&T (1) (BELOW EXISTING) <br /> ��� ) PANEL J-BOX TELCO BOARD 18-PAIR FIBER TRUNK pp <br /> /// ///// ////TT////////////////////////////////// //////////////�///////////// EXISTING AT&T FEEDLINES EXISTING & FINAL <br /> EX. SERVICE -) L EXISTING EXISTING DIPLEXERS - (24) 7/8" COAX CABLES <br /> DISCONNECT DISCONNECT Cr.) • - (2) FIBER TRUNKTRUNKS EQUIPMENT PLANS <br /> - (1) RET <br /> FINAL EQUIPMENT PLAN <br /> -.---i- --j 1"=2'-0° (FULL SIZE) <br /> 2' 1' 0 2' 1°=4'-0' (11x17) C-1 tat <br />