Laserfiche WebLink
AT&T <br /> FINAL EQUIPMENT SCHEDULE (VERIFY WITH CURRENT RFDS) <br /> ALPHA <br /> NOMA '. 141010 - MEER NA SURGE PROTECTION CARIES ail% CROWN <br /> 'CI10D" TECN. STATUS/IMMIFICIUER MODEL: ATIURN MG CENTER DIY. SIA1U5/NODFL LO WIION DIY. STATUS LOCATION GM STATUS/NO0a On'. SUMS/MODEL WRY. STATUS/ LB16 CASTLE <br /> I (E)RRH 4T4R B5 160W AHCA TOWER 8 (E)7/8'COAX 130'-0' 1505 WESTLAKE AVENUE NORTH,SUITE 800 <br /> Al LTE/50 (C COMMSCOPE 120' 104' 1 (E)RRH4x25-WCS-4R TOWER - - - - - - - SEATTLE,WA 98109 <br /> NNH4-65C-FI6 <br /> 1 (E)RET 130'-0' <br /> 1 (E)RDI B66A RRH4X45-4R TOWER <br /> 2 (E)/8 AWE DC 130'-0' O <br /> A2 S0 (P)NOXIA AEON 120 106' - • - - - - - - - 1 (E)DC6-48-60-18-8F <br /> 1 (E)FIBER 130'-0' O <br /> • <br /> A3 - P.MARSHALL&ASSOCIATES <br /> (P)RRH 474R <br /> P 1 812/14/29 370W AHJR;A TOWER <br /> A4 LTE/5G CIA-URN (L&1l)BH+�6517-17-21-21 120 104' 1 (E)825 RRN4X30-4R TOWER - - - - - - - - - - <br /> BETA SNO5 <br /> 1 (E)RRH 4T4R 85 1601V AHCA TOWER <br /> 81 LTE/5G (E)COMMSCOPE 25,3' 104' I (E)RRH4x25-WCS-4R TOWER - - - - - - - - 8 (E)7/8'COAX 130'-0' 3 <br /> NNH4-65C-R6 <br /> I (E)RRH 666A.RRH4X45-4R TOWER BU #:.856390 <br /> PAINE FIELD <br /> 2 (E)/8 AWG OC 130'-0' <br /> B2 SG (P)N010A AEQK 250' 106' - - - - _ _ _ - 1 (E)DC6-48-60-18-BF 1118 80TH STREET SOUTHWEST • <br /> 1 (E)FIBER 130'-0' EVEREIT, WA 98203 <br /> B3 - - - - - - - - - - - - - - - - <br /> (P)RIM 47411 <br /> (P)CE<IAIA)f 1 812/14/29.370W NRBBA TOWER <br /> B4 13E/5G CMA-U8116E BHH-6517-17-21-21 250 104' - - - - - - - - - - REV DATE DESCRIPTION <br /> 1 (E)825 RRH4X30-4R TOWER <br /> A 1/12/22 PRELIMS <br /> CAMMA 0 3/16/22 FOR CONSTRUCTION <br /> I (E)RRH 4T4R 85 160W AHCA TOWER 1 4/13/23 FOR CONSTRUCTION <br /> G1 LTE/56 (E)COMLISCOPE 10• 104' 1 (E)RRH4x25-WCS-4R TOWER - - - - - - - 8 (E)7/8'COAX 130'-0' <br /> NNH4-65C-R6 2 4/20/23 FOR CONSTRUCTION <br /> 1 (E)RRH 666A RRH4X45-4R TOWER <br /> 2 (E)/8 AWE DC 130'-0' - <br /> G2 5G (P)NO164 AEON 10' 106' - - - - - - - - 1 (E)DC6-48-60-18-8F <br /> 1 (P)FIBER 130'-0' <br /> G3 - - - - - - - - - - - - - - - - - <br /> (P)RRH 4T4R • <br /> (P)CEIIAIAX 1 812/14/29 370W AHIBBA TOWERG4 L1E/50 CIA-UBNIBULBFH 10' 10 <br /> -8517-17-21-21 4' - - <br /> - - - - - _ _ - <br /> 1 (E)875 RRH4X30-4R. TOWER <br /> ICI <br /> (E)-ammo <br /> (P)-PROPOSED <br /> Voltage Drop Calculations CABLE TOTALS DESIGNED:MSW <br /> Voltage(V)_ 48 I Amperage(A)_ 10.00 I Temperature('C)= 75 I - • 24 COAX 7/8' 130'-0' - DRAWN: MSW <br /> Power Plant to DC-8(Jumper) DC43 to Squid.(Trunk) Squid to RRH(Jumper) Final Voltage Total Voltage ( K �''. CHECKED:PWM <br /> Sector 6 DC 08 AWE 130'-O' .t �' <br /> Wire Size Wire Length(ft) R(DAcft) Voltage Drop Wire Stze Wire Length(ft) R(Grkft) Voltage Drop Wire Size Wire Length(ft) R(DAM Voltage Drop M Drop(96) <br /> Alpha 8 15 0.7780 0.2334 8 130 0.7780 2.0228 8 15 0.7780 0.2334 46.51 5.19 3 .FIBER - 3/8' 130'-0' .:� JOB f: <br /> Beta 8 15 0.7780 02334 8 130 0.7780 2.0228 8 15 0.7780 0.2334 45.51 5.19 21 CCAO6M-0040 <br /> Gamma 8 15 0.7780 0.2334 8 130 0.7780 2.0228 8 15 0.7780 0.2334 45.51 5.19 I RET 3/8' 130'-0' UM NUIDER 804-106-1E4KM <br /> 1.CALCULATIONS ARE MSED ON SIRAIOED,COPPER CONDUCTORS. <br /> 2.AESST NDE SLUES FOR CRILUCTORS ARE RUED ON TABLE 8 OF THE NEC,DI18CT-CURRENT RESUME FOR CONDUCTORS.3.LENGRI SHORN S THE LENGTH ONE-WAY TO OENCE. - FINAL ANTENNA & <br /> CABLE SCHEDULE <br /> NOTES: <br /> 1.REFER RIRRAL RIDS FOR FBAL <br /> RF CONFIGURATION. FINAL ANTENNA Sc CABLE SCHEDULE <br /> 2.REDS I)4329427 BERG USED. C-4 <br />