GENERAL STRUCTURAL NOTES ABBREVIATIONS SPECIAL INSPECTIONS SCHEDULE '••,a°T**R'c' <br /> • DESIGN CRITERIA HELICAL PILES AB ANCHOR BOLT FTG FOOTING "•r,k., • r•: <br /> CODE:2018 IRCIIBC&AMENDMENTS AS ADOPTED BY THE REVIEWING AGENCY/COUNTY. 1. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2018 INTERNATIONAL ABV ABOVE GA GAUGE SPECIAL INSPECTIONS TABLES PER THE 2018 IBC.ALL ITEMS NON-APPLICABLE ITEMS HAVE BEEN •-, <br /> ROOF 25 PSF SNOW(GROUND) BUILDING CODE(IBC). AFF ABOVE FINISH FLOOR GALV GALVANIZED MARKED WITH A--.ITEMS REQUIRING SPECIAL INSPECTION HAVE BEEN MARKED WITH AN"X". �sreN't47 <br /> FLOORS 2. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED BY IDEAL MANUFACTURING,INC.,AND SHALL BE ALT ALTERNATE GLB GLULAM BEAM <br /> RESIDENTIAL 40 PSF IN ACCORDANCE WITH ESR-3750. ALUM ALUMINUM GR GRADE TABLE 1705.3 <br /> REQUIRED SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION <br /> BALCONY/DECK 60 PSF 3. ALL MATERIAL PROPERTIES OF HEUCAL PILE COMPONENTS SHALL BE IN ACCORDANCE WITH ESR-3750. APPROX APPROXIMATE GYP GYPSUM WALL BOARD <br /> 4. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES ACCEPTANCE AYC ALASKAN YELLOW CEDAR ADO HOT-DIPPED GALVANIZED TYPE CONTINUOUS <br /> PERIOD',Eno', REFERENCED IBC <br /> CIAL <br /> GENERAL CONDITIONS CRITERIA FOR CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING POLYMER(EAA) BB BOX BEAM HOE HEADER INSPECTION WSPECTION STANDARD REFERENCE <br /> 1. THE CONTRACTOR SHALL EXAMINE THE STRUCTURAL DRAWINGS AND SHALL NOTIFY THE STRUCTURAL COATINGS(AC228). BF BOTTOM FLUSH HF HEM FIR Ae tot,ettWncm��preseessing <br /> tr venry a<eeiu - - 253.26.51-2653 19084 <br /> ENGINEER OF ANY DISCREPANCIES HE MAY FIND BEFORE PROCEEDING WITH THE WORK. 5. ALL HELICAL FOUNDATION COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE BLDG BUILDING HGT HEIGHT 2 Reinforcing bar w rang <br /> 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND SITE CONDITIONS BEFORE BLKG BLOCKING HT HEIGHT a venywelaamrnyofremr«Ong bars - - <br /> REINFORCING STEEL,BUILDING STRUCTURAL STEEL,OR ANY OTHER METAL BUILDING COMPONENTS PER aner Iran ASTMA7o6. AWS O1 a <br /> STARTING WORK,THE ARCHITECT/ENGINEER SHALL IMMEDIATELY BE NOTIFIED IN WRITING OF ANY AC358 SECTION 3.9. BM BEAM IN INCH e.Inspect single-pass NMI Welds,maximum ACI 318 2654 <br /> DISCREPANCIES. 6. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS, BOT BOTTOM IT JOINT 5/is.sand <br /> - <br /> 3. ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING DRAWINGS SHALL 7. ONLY MANUFACTURER-APPROVED CONNECTORS,ADAPTORS,AND ACCESSORIES MAYBE USED. BP BOTTOM PLATE MAX MAXIMUM 1 inspect all dieter Weiss. - <br /> 3 nspectInSpeCl antnors cast n called i e - ACI 310 17 8 2 - III <br /> BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE STRUCTURAL ENGINEER BEFORE 8. HELICAL PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE OF BRG BEARING MIN MINIMUM °inspect anchors past-instated in hardened III <br /> PROCEEDING WITH ANY WORK SO INVOLVED. INCLINATION OF 0/-1 DEGREE FROM VERTICAL PER SECTION 4,2.1 OF ESR-3750. BPNN BETWEEN MISC MISCELLANEOUS concrete nn,nl.rs. Q -. <br /> BSMT BASEMENT a.Adrenne anchors Instated in llonzonlaly - c3 <br /> 4. IN CASE OF CONFUCT, NOTES AND DETAILS OF THESE STRUCTURAL DRAWINGS SHALL TAKE 9. MONITOR AND RECORD DEPTH OF PILE PENETRATION.PROVIDE TORQUE MONITORING DEVICE AS PART OF NB NON-BEARING or upwardly inclined orieniahals to resist - - ACI 318 178 2 4 - r w <br /> B/W BOTTOM OF WALL sustained tension loads <br /> PRECEDENCE OVER THE°GENERAL NOTES"AND/OR'STANDARD DETAILS'. THE INSTALLING UNIT.MONITOR AND RECORD TORQUE APPLIED DURING THE INSTALLATION OF EACH PILE NO NUMBER b Mechanical armors and aansne anchors z1 D <br /> 5. IF A SPECIFIC DETAIL IS NOT SHOWN FOR ANY PART OF THE WORK,THE CONSTRUCTION SHALL BE THE AT SPECIFIC DEPTHS. CANTCANT CANTILEVER OC ON CENTER not defined 4 a re In - - <br /> W <br /> NTROLACt 318.Cn.19. 1904.1.1904.2. - i <br /> SAME AS FOR SIMILAR WORK. 10. HELICAL PILES SHALL BE INSTALLED TO THE MINIMUM TORQUE VALUE REQUIRED TO PROVIDE THE CLG. OILING JOINT PSF POUNDS PER SQUARE FOOT 5 vent'use a required design mu - - 2643.26.4 4 19082 19083 <br /> 6. WORKING DIMENSIONS SHALL NOT BE SCALED FROM PLANS, SECTIONS, OR DETAILS ON THESE MINIMUM REQUIRED LOAD CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF SAFETY NO LESS PSI POUNDS PER SQUARE INCH 6 Prior to concreteplacement.tabroale specimens ASTM C 172 v I- w <br /> for strength tests,perform stamp and air <br /> CU CEILING JOIST - - ASTMC31 1908.10 Z-7 W <br /> DRAWINGS. THAN TWO(2).THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THE ALLOWABLE TORSIONAL PT PRESSURE TREATED contest tests.and determine the icuipe,alure o Aa 31e:2645 zs 12 z <br /> CUT CLEAR the concrete <br /> 7. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT AND THE STRUCTURAL ENGINEER OF ANY CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE PILE ASSEMBLY. CMU CONCRETE MASONRY UNIT RAF RAFTER 7 nspect concrete and shotcrete placement for - - AC1318 26.4 5 19'8'6'1908.7' O O <br /> CONDITION WHICH IN HIS OPINION MIGHT ENDANGER THE STABILITY OF THE STRUCTURE OR CAUSE 11. ALL BRACKETS AND HELICAL PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY TO ACHIEVE REF REFERENCE proper verily maintenancapplication e ofspecmed can 19088 I <br /> COL COLUMN temprature and techniques <br /> - - ACI 318'2647-264.9 19089 <br /> DISTRESS TO THE STRUCTURE, THE MINIMUM REQUIRED BEARING CAPACITY INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO(2). CONC CONCRETE REINF REINFORCEMENT 9 Inspect prestressed concrete Inc <br /> 8. THE CONTRACTOR SHALL SUPERVISE AND DIRECT HIS WORK AND HE SHALL BE SOLELY RESPONSIBLE 12. REPAIR BRACKETS MUST BE CONCENTRICALLY LOADED AND THE BRACKET PLATE MUST BE FULLY CONN CONNECTION REQD REQUIRED a Application of presiressrng forces.and - - ACI318 269.21 - <br /> FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES. PROVIDE ENGAGED WffH BOTTOM OF CONCRETE FOUNDATION. CONSi CONSTRUCTION SF SQUARE FOOT 10 Inspect erection of prerecasstt concrete members - - ACtt 318 Cn 268 - <br /> ADEQUATE SHORING AND BRACING OF ALL STRUCTURAL MEMBERS DURING CONSTRUCTION. 13. ALL HELICAL PILE ASSEMBLY COMPONENTS MUST HAVE ADEQUATE STRENGTH TO DEVELOP THE TORQUE CONT CONTINUOUS SIM SIMILAR 71.Verify in-Stu concrete strength.poor to stressing <br /> or tendons m al of post-tensioned concrete and AU 318'2610 2 1/• <br /> 9. ALL WORK SHALL CONFORM TO THE MINIMUM STANDARDS OF THE LATEST EDITION OF THE REQUIRED FOR INSTALLATION AND ALL INDUCED STRESSES. CTR CENTER SPF SPRUCE PINE FIR of teno removal or shores and roans noel - - - rj9 _ <br /> iiy <br /> INTERNATIONAL BUILDING CODE,AND ALL OTHER REGULATING AGENCIES EXERCISING AUTHORITY OVER 14. THE PILE QUANTITY,LAYOUT,AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED WITHOUT DET DETAIL STD STANDARD hearts and stnlchmal slabs '�� <br /> 12 Inspect[(morrow!,5tiltsfor shape.location and <br /> ANY PORTION OF THE WORK. WRITTEN APPROVAL FROM THE ENGINEER-OF-RECORD PRIOR TO INSTALLATION. DF DOUGLAS FIR(SOUTH) SYP SOUTHERN YELLOW PINE daonfeensisions«me concrete member being - - Aa 31826.101(e) - <br /> 10. SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. 15. CONTINUOUS SPECIAL INSPECTION IN ACCORDANCE WITH 2015 AND 2012 INC SECTION 1705.9 MUST BE DFL DOUGLAS FIR LARCH T/ TOP OF <br /> PROVIDED FOR THE INSTALLATION OF THE HELICAL PILES AND FOUNDATION BRACKETS.ITEMS TO BE DIM DIMENSION T/C TOP OF CONCRETE TABLE 1705 7 /'WHERE THE NOTES,DRAWINGS,AND/OR SPECIFICATIONS DIFFER,THE MORE STRINGENT REQUIREMENT REQUIRED SPECIAL INSPECTIONS AND TESTS OF DRIVEN DEEP FOUNDATION ELEMENTS , <br /> SHALL APPLY. RECORDED AND CONFIRMED BY THE SPECIAL INSPECTOR MUST INCLUDE THE FOLLOWING: DJ DOUBLE JOIST T/P TOP OF PLATE <br /> 11. REFER TO THE ARCHITECTURAL DRAWINGS FOR INFORMATION NOT COVERED BY THESE GENERAL NOTES <br /> A. PRODUCT MANUFACTURER DIA DIAMETER <br /> T/S TOP OF STEEL TYPE CONTINUOUS SPECIAL INSPECTION PERIODIC SPECIAL INSPECTION <br /> B. MANUFACTURER'S CERTIFICATION OF THE INSTALLERS DN DOWN T/W TOP OF WALL 1 Verify element riatenas.saes and lengths comply with <br /> the requirements. % - <br /> OR THE STRUCTURAL DRAWINGS. DS DOWN SPOUT 2.Deermme capacmies of lest elements and conduct <br /> 12. NOTIFY ENGINEER OF ALL FIELD CHANGES PRIOR TO INSTALLATION. C. PRODUCT TYPE AND CONFIGURATIONS FOR HELICAL PILE LEAD SHAFT SECTIONS,EXTENSIONS, TF TOP FLUSH addnional mad tests.as required x - <br /> BRACKETS,BOLTS,THREADED RODS,NUTS,WASHERS,AND TORQUES AS SPECIFIED IN THIS EA EACH 3 Inspect relying operations and maintan complete and <br /> 13. DISCREPANCIES FOUND BETWEEN STRUCTURAL DRAWINGS AND OTHER DOCUMENTS ARE TO BE NOTED EF EACH FACE TJ TRIPLE JOIST accurate records roreacn element x - <br /> REPORT AND THE CONSTRUCTION DOCUMENTS T/BM TOP OF BEAM 4 Verify placement locators and pumbness,conarm <br /> IN WRITING TO THE ENGINEER PRIOR TO CONSTRUCTION. / - <br /> D. INSTALLATION PROCEDURES FOR THE HELICAL PILE SHAFT,INSTALLATION EQUIPMENT USED,AND El EXPANSION JOINT type and sue of hammer record number of bows per <br /> 14, ALL CONSTRUCTION SHALL BE DONE WITH MATERIALS,METHODS,AND WORKMANSHIP ACCEPTED AS ELEV ELEVATION T/SLABTOP OF SLAB foot of penetration.determine required penetrations o x - <br /> THE IDEAL FOUNDATION SYSTEMS INSTALLATION INSTRUCTIONS achieve design capacty record tip and but elevators <br /> GOOD PRACTICE BY THE CONSTRUCTION INDUSTRY IN CONFORMANCE TO THE PROVISIONS OF THE EN EDGE NAILING(PANEL) TP TOP PLATE and document any dar,agetofondatonelement <br /> "INTERNATIONAL BUILDING CODE"(INC),AND STANDARDS REFERENCED THEREIN. E. ANTICIPATED AND ACTUAL PILING DEPTH EQ EQUAL TYP TYPICAL 5 For steel elements.perform additional special - - <br /> F. REQUIRED TARGET INSTALLATION TORQUE OF PILES AND MINIMUM DEPTH OF INSTALLATION spectiom in accordance with section 17c;_z <br /> 15. STRUCTURAL STABILITY OF ALL NEW AND EXISTING STRUCTURES DURING CONSTRUCTION SHALL BE ES EACH SIDE UNO UNLESS NOTED OTHERWISE 6 For concrete eiemens and concrete-flied elements <br /> THE RESPONSIBILITY OF THE CONTRACTOR.THIS INCLUDES EXCAVATIONS.COLUMNS,EQUIPMENT G. INCLINATION AND POSITION OF PILES,TOP OF PILE EXTENSION IN FULL CONTACT WITH BRACKET. E EACH WAY UPA UNDER POST ABOVE performtest mill�Ion / 'o inspections in - - <br /> LOADS.MATERIAL LOADS,AND OTHERS.OBSERVATIONS BY THE ENGINEER-OF-RECORD DO NOT TIGHTNESS OF ALL BOLTS AND EVIDENCE THAT THE PILE FOUNDATION SYSTEMS ARE INSTALLED FB FLUSH BEAM UWA UNDER WALL ABOVE 7 For specialty cements.perform addnionai espections BY AN APPROVED IDEAL FOUNDATION SYSTEMS INSTALLER. as determined by the registered design professional in - <br /> - <br /> INCLUDE INSPECTIONS OF TEMPORARY LOADING AND STABILITY DURING CONSTRUCTION. FIN FINISH VERT VERTICAL responsible charge <br /> 16. PILES IMPROPERLY INSTALLED BECAUSE OF MISLOCATION,MISALIGNMENT,OR FAILURE TO MEET OTHER <br /> 16. MINIMUM ASSUMED SOIL BEARING CAPACITY...............3,000 PSF FL FLOOR VIF VERIFY IN FIELD <br /> SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE.ABANDON REJECTED PILES AND <br /> INSTALL ADDITIONAL PILES AS REQUIRED. FLSHG FLASHING W/ WITH 1908 HOWARD AVE <br /> _ <br /> FND FOUNDATION WC WESTERN CEDAR EVERETT <br /> HELICAL PILE PROOF TESTING FP FIREPLACE WP WATERPROOF WA 98203 <br /> THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE(3) <br /> FT FOOT WWF WELDED WIRE FABRIC <br /> CONCRETE ANCHORS PERCENT OF PILES UP TO FIVE(5)PILES MAXIMUM(ONE(1)MINIMUM)IN ACCORDANCE WITH THE PROCEDURE <br /> 1. ALL SPECIFIED CONCRETE ANCHORS SHALL BE SIMPSON STRONG TIE,HILTI,OR EQUIVALENT.SPECIAL OUTLINED IN ASTM D1143 AND/OR THE 2018 INTERNATIONAL BUILDING CODE(IBC).THE MAXIMUM TEST LOAD S230223-3XR <br /> INSPECTIONS REQUIRED. SHALL BE TWO-HUNDRED(200)PERCENT OF THE SPECIFIED DESIGN LOAD. <br /> JT <br /> STRUCTURAL AND MISC.STEEL PROOF TESTING SHALL BE IN ACCORDANCE WITH ASTM STANDARD D 1143-81.GEOTECHNICAL SPECIAL <br /> 1. REFERENCE STANDARDS:DESIGN,FABRICATION AND ERECTION ARE TO BE IN ACCORDANCE WITH THE INSPECTOR SHALL BE CONTINUOUSLY PRESENT DURING PILE INSTALLATION AND LOAD TESTING.PROOF MRT <br /> LATEST EDITION OF THE AISC"CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES'. TESTING SHALL BE APPLIED TO EACH OF THE LOAD CONFIGURATIONS SPECIFIED IN THE PILE SPACING&LOAD <br /> 2. MATERIALS: REQUIREMENTS TABLE.MINIMUM ONE(1)PILE PER LOAD CONFIGURATION SHALL BE TESTED. 04/13/2023 <br /> BOLTS-ASTM A307,UNLESS OTHERWISE NOTED <br /> WF BEAMS-ASTM A572-50(Fy=50,000 PSI) <br /> HSS ROUND COLUMNS-ASTM A500 Gr.B(Fy=42,000 PSI) <br /> HSS RECTANGULAR COLUMNS-ASTM A500 Gr.B(Fy=46,000 PSI) <br /> ALL OTHER STEEL•ASTM A36(Fy=36,000 PSI) <br /> STRUCTURAL STEEL WELDING <br /> 1. CONFORM TO THE AWS CODES D1.1 AND D1.3.,AND USE ONLY CERTIFIED WELDERS.WELDS NOT <br /> SPECIFIED ARE TO BE 1/4"CONTINUOUS FILLET MINIMUM.USE DRY E70 ELECTRODES. <br /> ALTERNATES: <br /> Ln <br /> 1. ALTERNATE ASSEMBLIES AND MATERIALS WILL BE CONSIDERED FOR REVIEW.ENGINEER MAY REQUEST H <br /> PAYMENT FOR REVIEW;CONTRACTOR WILL BEAR BURDEN FOR ADDITIONAL PAYMENT AT NO ADDITIONAL <br /> COST TO OWNER, 0 <br /> 108517E SAFETY: J <br /> Q <br /> 1. THE ENGINEER AND/OR ARCHITECT HAVE NOT BEEN RETAINED OR COMPENSATED TO PROVIDE DESIGN CC <br /> AND/OR CONSTRUCTION REVIEW SERVICES RELATED TO THE CONTRACTOR'S SAFETY PRECAUTIONS OR C!Ti( O F EVERETT H <br /> H <br /> TO MEANS,METHODS,TECHNIQUES,SEQUENCES OR PROCEDURES FOR THE CONTRACTOR TO PERFORM 4.i. <br /> f.s r�} A. �Y ;,.,t U <br /> HIS WORK.THE UNDERTAKING OF PERIODIC SITE VISITS BY THE ENGINEER AND/OR ARCHITECT SHALL e i`L',�`t(„, yj`V 9 L ! \ iJ E P A�I T , <br /> NOT BE CONSTRUED AS SUPERVISION OF ACTUAL CONSTRUCTION NOR MAKE HIM RESPONSIBLE FOR 1- <br /> PROVIDING A SAFE PLACE FOR THE PERFORMANCE OF WORK BY THE CONTRACTOR,SUBCONTRACTORS, V) <br /> SUPPLIERS OR THEIR EMPLOYEES,OR FOR ACCESS,VISITS,USE,WORK,TRAVEL,OR OCCUPANCY BY ANY Q -i., <br /> PERSON. ce Ln <br /> W <br /> .. z <br /> LLJ <br /> 0 <br />