Otak__,,
<br /> . 0-
<br /> __ . .
<br /> communitytreansTt ,..,/1 —//./k.
<br /> 11241 Willows Road NE,Suite 200
<br /> Redmond,WA 98052
<br /> 425.822.4446
<br /> Swift STATION RETROFITS www.otak.com
<br /> Blue Line Station Location&Jursidiction GENERAL PROJECT NOTES
<br /> Station Street Location NB SB Jurisdiction 1. WORK SITE AREAS RESIDE IN SEVEN(7)DIFFERENT JURISDICTIONS:CITY OF SHORELINE(KING COUNTY METRO'S
<br /> AURORA VILLAGE TRANSIT CENTER),CRY OF EDMONDS,CITY OF LYNNWOOD,CITY OF EVERETT,CITY OF MILL CREEK,
<br /> AU,Ui d'dilldgefimoI,Q9Re1 (42742) -- C;.refsh..rch,,c(King Co.Metro) AND CITY OF BOTHELL,AND UNINCORPORATED SNOHOMISH COUNTY(WSDOT RIGHT-OF-WAY).
<br /> --- - - 2. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT PLANS,SPECIFICATIONS,AND SPECIAL
<br /> an o9 at ao8th Si.Svc- (42747) (#2748) - Citi of Edmonds/WSDOT PROVISIONS(CONTRACT DOCUMENTS).
<br /> SR 33 et 21Gth St.SW (*27.5°) (*275A) City Of I ygniunntlifity of FAmnndr/WCnnT 3. THE CONTRACTOR SHALL VERIFY ALL EXISTING DATA SHOWN IN THESE DOCUMENTS AND NOTIFY ENGINEER IMMEDIATELY
<br /> OF ANY CONFLICTS WITH PROPOSED FEATURES PRIOR TO CONSTRUCTION.
<br /> so NO an tuwsn st.Svv - (#27GO) G.y of L,n,,..eed/W`DOT 4. THE CONTRACTOR SHALL PROTECT ALL AREAS OUTSIDE THE WORK ZONE AND/OR OUTSIDE THE RIGHT-OF-WAY FROM
<br /> DISTURBANCE.ALL DISTURBED AREAS SHALL BE FULLY RESTORED TO PROPOSED OR PRE-EXIST1NG CONDITIONS.
<br /> (112761) City of LY'InwMod/WSDOT 5. AN APPROVED SET OF CONSTRUCTION PLANS FOR ALL WORK SHALL BE KEPT ON THE CONSTRUCTION SITE AT ALL
<br /> TIMES.
<br /> Sir on ai"t96th'ST.-aw (43217) (#27G4) City of Lynnwood/WSDOT
<br /> 6. A PRE-CONSTRUCTION CONFERENCE SHALL BE HELD WITH THE APPLICABLE JURISDICTIONS AND COMMUNITY TRANSIT
<br /> alto!di.L7OL�l .A (#27C7) C:;,V L,ao..ead/WODOT PRIOR TO STARTING ANY CONSTRUCTION ON THE PROJECT.
<br /> 7. THE SOURCE OF SUPPLY OF EACH OF THE MATERIALS FURNISHED BY THE CONTRACTOR SHALL BE SUBMITTED TO THE
<br /> bit NJ at 134th Si.Say - (0c770) City of L,.,n..eed/hlSIOT ENGINEER FOR APPROVAL PRIOR TO DELIVERY.ONLY MATERIALS CONFORMING TO THE REQUIREMENTS OF THE PROJECT
<br /> SPECIFICATIONS AND APPROVED BY THE ENGINEER SHALL BE USED IN THE WORK.TESTING OF MATERIALS MAY INCLUDE
<br /> SB 99 al 14E11,7..!W (M277') (#2'78) U:.:.:eer,erdlcdis a w4:,6 CO_:.q/W6DOT TESTS OE ACTUAL SAMPLES,MANUFACTURER'S CERTIFICATIONS,APPROVAL OF CATALOG CUTS,OR FIELD ACCEPTANCE
<br /> REPORTS.
<br /> SR 93 at L6a..oL,Way (#2779) (82700) Ur,;oce.p,,r,,cW S:,eham:,h Ce_n.,/W.DOT
<br /> SR 99 at Aii port Rd. -- (112782) U,.,n,.o,po.at,.d S.,ehom;,h Ce,.nt,/WSDIST
<br /> SR 99 at Airport Rd. (U°'a+) reyf,f c,o.eff/WmnT
<br /> SR 99 at 112th St.SW (42783) (42784) City of Everett/WSDOT
<br /> Evergreen Way at 4th Ave W (#2787) (42788) City of Everett
<br /> Evergreen Way at Casino Rd. (#2795) (#2796) City of Everett
<br /> Evergreen Way at Madison St. (#2807) City of Everett
<br /> Evergreen Way at Pecks Dr. - (42810) City of Everett
<br /> Evergreen Way at 50th Street (42815) (42816) City of Everett
<br /> Rucker Ave at 40th St. (42819) - City of Everett
<br /> Rucker Ave at 41st St. - (#2620) City of Everett
<br /> Wetmore Ave at Pacific Ave (42835) (#2836) City of Everett
<br /> E.,rott Stati..n (.1831 (*38'8) VD/of E-are”
<br /> Key
<br /> Swift Stations Within the City of Everett Receiving New Windscreens
<br /> Station Being Reviewed and Permitted
<br />
|