Laserfiche WebLink
MyBuildingPermit.com <br /> a service of eCityGov.net Construction Tip Sheet 05 <br /> EXTERIOR SHEATHING <br /> EXISTING STUD WALL <br /> Existing 2x BAND JOIST �� <br /> OR ENGINEERING RIM -�a ' ► <br /> BOARD - ' /" <br /> 2'MIN <br /> DECK JOIST <br /> ta� :'I'I <br /> 5 MAX fillM LAG SCREWS OR BOLTS <br /> 2'MINow.411111111111 <br /> ••s%'• 1 4 JOIST HANGER <br /> Lag screw or bolt Stagger fasteners in 2 rows <br /> 2"min. • <br /> D 5 1/2"min.for 2x8* <br /> 6 1/2"min.for 2x10 <br /> 5"max. - 7 112"min.for 2x12 <br /> • <br /> • 3/4"min. <br /> Ledger * Distance can be reduced to <br /> -2"min. 4 1/2"if lag screws are used or <br /> Minimum edge distance for if bolt spacing is reduced to <br /> specialized screws. See that of lag screws to attach 2x8 <br /> manufacturer's technical bulletin. ledgers to 2x8 band joists <br /> Lateral Loads <br /> •feet in height.) <br /> I <br /> �141111ll�11 r(( <br /> flll��l 2' min. <br /> C <br /> _ _ .evice <br /> at 4 locations evenly distributed Floor joists <br /> along the deck and within 2 ft of <br /> each end.Install per manufacturer <br /> Fully threaded 3f8"diameter lag screw <br /> Option # 1 predrilled with a minimum of 3 in Option # 2 <br /> embedment into solid framing. <br /> January 14, 2022 MyBuildingPermit.com I Basic Deck <br /> CityGov.net <br /> 2005 eCltgGenAliance <br />