DocuSign Envelope ID:348D5D1F-773E-441104C5-8C16EAD587CA • 10 of 40 <br /> Friday, July 31, 2020 AariPt <br /> S C O P E OF WORK FOUNDATION SPECIALIST <br /> Crew to install 21 Helical piers, 6 Stabil-loc push piers, and 3 helicals with concrete pile caps and lift to maximum practical <br /> recovery. Crew will install 8 new posts in the crawl space with adjustable bases. Crew will also do 15 concrete remove and <br /> replace in storage room as well as sidewalk on north side of home Crew will install Angle Iron on south side of home and Steel <br /> channel on west, north and east sides. Retaining wall will not require channel. Customer will need to have flooring in downstairs <br /> west rooms or deck baords to allow piers to be installed. Permit and engineering costs included. Lifetime transferable warranty <br /> inlcuded with piers. 50% down and 50% due upon job completion. Job has limited dingo access. Crawl space entrance is located <br /> under back deck on right side of home. Crawl space height is 2 feet. Home owner may have deck detached from home before <br /> lift. Depth Claus: Piers bid to 25 foot max depth, $20 per foot charge beyond that. <br /> L120 is in concurrence with pile layout recommended by R&R provided that the proposed layout is followed as marked and piles are installed <br /> with a maximum pile spacing of 6'-0"o.c.w/the installation of L6x6x3/8 angle or C6x8.2 channel spanning from pile-to-pile per the attached <br /> SSK-01, SSK-02 and SSK-03. Install pile caps per SSK-04. <br /> NOTES: <br /> 1. It is acceptable to install piles at the spacing shown with±0'-6"tolerance to allow for unexpected obstructions encountered during pile <br /> installation provided that no two adjacent spans exceed the spacing limitation of 6'-0"o.c. UNO. <br /> 2. End piles are to be placed within 3'-0"from corner as specified below UNO. <br /> 3. Supplemental steel to be anchored to concrete with 5/8"diam Simpson Titen HD screw anchors @ 12"o.c.w/4"minimum embedment. <br /> Refer to attached SSK-01. <br /> 2 "` 1:). <br /> LOCATE PILE CENTER PILES <br /> WITHIN 1'-0" • • UNDER EXISTING <br /> FROM CORNER 5'-I"MAX (5)PILES @ POSTS <br /> Al6'-0"OC MAX LOCATE PILE <br /> 1 17 ' 15 WITHIN 3'-0" <br /> • 3 1 `- f 2 C6 6 FROM CORNER <br /> 1,34 <br /> INSTALL L6x6x3/8 ANGLE <br /> (3)PILES @_ FULL LENGTH OF WALL C63 6'-0"OC MAX 20 FROM CORNER TO CORNER X =Helical w/Concrete Pile Cap <br /> ittZ . co r, -0-12 <br /> INSTALL C6x8.2 CHANNEL ® =6x6 PT Posts <br /> --\\-21 .FULL LENGTH OF WALL '8 -6 3/4 =Helical Pier <br /> FROM CORNER TO CORNER (5)PILES @ <br /> (2)PILES @ Ciil .'t116'-0"OC MAX =Stabil-Loc Push Pier <br /> 2'-0"MIN OC - <br /> .'. : E -6 3/8 010 LOCATE PILE WITHIN <br /> 4'-0" FROM CORNER <br /> 1/2 -3 _5(4)PILES @ C6 LOCATE PILE WITHIN <br /> 0 . E 6' 0"OC MAX I 3'-0" FROM CORNER <br /> di 33 4/ <br /> 1/4 LOCATE PILE WITHIN <br /> -1/2 Cg,3'- • C6 6 2'0" FROM CORNER <br /> CENTER PILES ON__� i_(2)PILES @ <br /> o EXISTING POSTS 1 8 Q 6'-0"OC MAX <br /> - T-1/2 -1/2# 1• Q 2 3/4j 5 3/4 . <br /> ' 3 NCENTER PILE ON <br /> 1 • WALL SEGMENT <br /> (3)PILES @ LOCATE PILE <br /> 6'-0"OC MAX WITHIN 3'-0" <br /> FROM CORNER <br /> r <br /> NOTE:L120's scope is limited to the perimeter support systems/continuous footings of the primary structure.All stabilization and replacement efforts of <br /> interior elements,exterior decks,and deck supporting elements are outside of L120's contract and scope and are not addressed in this package.-L120 <br />