My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2126 RUCKER AVE 2020 Plans 2025-07-08
>
Address Records
>
RUCKER AVE
>
2126
>
Plans
>
2126 RUCKER AVE 2020 Plans 2025-07-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 9:44:21 AM
Creation date
7/8/2025 9:42:55 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2126
Permit
B2012-017
Year
2020
Notes
INSTALL HELICAL PILES AND STABIL-LOC PUSH PIERS WITH
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 of 40 <br /> PROJECT NO. SHEET NO. <br /> S200803-3 SSK-02 <br /> PROJECT 2126 Rucker Ave, Everett, WA 98201 <br /> LONGITUDE SUBJECT Supplemental Steel Installation <br /> ONE TWENTY �T 11/16/2020 <br /> ENGINEERING&DESIGN BY DATE <br /> STEEL CHANNEL INSTALLATION AT(E)CONCRETE STEM WALL: <br /> STEEL SHALL BE CONTINUOUS <br /> WHERE POSSIBLE; <br /> IF REQ'D,JUNCTION BTWN <br /> SEGMENTS TO BE CTRD ON PILE; <br /> JUNCTION NOT TO OCCUR AT <br /> CORNER-ADJACENT PILES <br /> \ w <br /> ANCHOR PER�IOTE 2,GYP co�csrEn�WALL o <br /> f LL <br /> 0 <br /> F 1 <br /> ° ° ° A A 2 <br /> CONC FTG <br /> <u 0 <br /> Q CO 4 <br /> ANCHOR SPACING, co a up <br /> S=12"OC MAX UNO <br /> SUPPLEMENTAL CHANNEL <br /> C6x8.2 UNO I CHANNEL TO EXTEND <br /> BEYOND PILE @ EA END; <br /> TYP <br /> PILE AND CONNECTIONS PER MIN AT CORNERS <br /> R&R FOUNDATION SPECIALISTS,TYP <br /> ABBREVIATIONS <br /> NOTES: CMU=CONCRETE MASONRY UNIT <br /> 1)ALL STEEL MEMBERS AND COMPONENTS SHALL BE GALVANIZED FOR EXTERIOR USE. CONC=CONCRETE <br /> 2)ALL ANCHORS SHALL BE 5/8"0 SIMPSON TITEN HD SCREW ANCHORS W/4"MINIMUM EMBEDMENT INTO EA=EACHNTERED <br /> CONCRETE.ANY SUBSTITUTION SHALL BE SUBMITTED TO L120 FOR APPROVAL PRIOR TO INSTALLATION. MTGG=FOOTING MAxImum <br /> 3)ANCHORS SHALL BE INSTALLED WITHIN 6"OR LESS FROM EACH END OF STEEL MEMBER. oc=ON-CENTER <br /> CAL <br /> 4)ADDITIONAL REQUIREMENTS PER ANCHOR MANUFACTURER. NO=UNLESS NOTEDOTHERWISE <br /> L120 ENGINEERING&DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.