Laserfiche WebLink
= CASE <br /> PF ENGINEERING <br /> Consulting Electrical Engineers <br /> September 26, 2024 <br /> Mike Bearda <br /> Electrical Inspector <br /> City of Everett Public Works Department <br /> 3200 Cedar Street <br /> Everett,WA 98201 <br /> Project: Everett Center—Electrical Distribution Changes <br /> Plan Check Number: E2406-129 <br /> Subject: Responses to Electrical Review Comments <br /> Mr. Bearda, <br /> The following are in response to the Electrical Review Comments dated 7/11/2024: <br /> 1. A 30-day max demand recording meter was installed to measure the existing load on ATS-E. The <br /> total load on this ATS will not be increasing. <br /> The load summary has been added to Sheet E9.1 and is clouded. <br /> Please let me know if you have any questions or need additional information. <br /> Thank you, <br /> Michael Case, PE <br /> 19515 North Creek Parkway,Suite 302, Bothell,WA 98011 <br /> Phone:425-402-9400 <br />