My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-88 May 6, 2025 <br /> <br />Correction of defects shall be carried out until there are no deviations anywhere greater 1 <br />than the allowable tolerances. 2 <br /> 3 <br />Deviations in excess of the above tolerances that result from a low place in the HMA and 4 <br />deviations resulting from a high place where corrective action, in the opinion of the 5 <br />Engineer, will not produce satisfactory results will be accepted with a price adjustment. 6 <br />The Engineer shall deduct from monies due or that may become due to the Contractor 7 <br />the sum of $500.00 for each and every section of single traffic lane 100 feet in length in 8 <br />which any excessive deviations described above are found. 9 <br /> 10 <br />When utility appurtenances such as manhole covers and valve boxes are located in the 11 <br />traveled way, the utility appurtenances shall be adjusted to the finished grade prior to 12 <br />paving. This requirement may be waived when requested by the Contractor, at the 13 <br />discretion of the Engineer or when the adjustment details provided in the project plan or 14 <br />specifications call for utility appurtenance adjustments after the completion of paving. 15 <br /> 16 <br />Utility appurtenance adjustment discussions will be included in the Pre-Paving and Pre-17 <br />Planing Briefing (5-04.3(14)B3). Submit a written request to waive this requirement to the 18 <br />Engineer prior to the start of paving. 19 <br /> 20 <br />5-04.3(14) Planing Bituminous Pavement 21 <br />*** 22 <br />The Contractor shall call for locates before planing any HMA pavement. Any induction 23 <br />loop vehicle detectors which are within the planing area shall be discussed with the 24 <br />inspector prior to planing to see if the planing limits can be modified to save the loops. 25 <br />Any loops which are damaged in the planing process shall be replaced prior to the final 26 <br />overlay. The electrical subcontractor shall be on-call and the loops shall be replaced 27 <br />within 5 working days of the planing operation and paved within 3 working days of the 28 <br />loop installation. See Section 8-20 of the Specifications for details on loop installation 29 <br />and payment. 30 <br />*** 31 <br />The planing plan must be approved by the Engineer and a pre-planing meeting must be 32 <br />held prior to the start of any planing. See Section 5-04.3(14)B2 for information on planing 33 <br />submittals. 34 <br /> 35 <br />Where planing an existing pavement is specified in the Contract, the Contractor must 36 <br />remove existing surfacing material and to reshape the surface to remove irregularities. 37 <br />The finished product must be a prepared surface acceptable for receiving an HMA 38 <br />overlay. 39 <br /> 40 <br />Use the cold milling method for planing unless otherwise specified in the Contract. Do 41 <br />not use the planer on the final wearing course of new HMA. 42 <br /> 43 <br />Conduct planing operations in a manner that does not tear, break, burn, or otherwise 44 <br />damage the surface which is to remain. The finished planed surface must be slightly 45 <br />grooved or roughened and must be free from gouges, deep grooves, ridges, or other 46 <br />imperfections. The Contractor must repair any damage to the surface by the Contractor’s 47 <br />planing equipment, using an Engineer approved method. 48
The URL can be used to link to this page
Your browser does not support the video tag.