Laserfiche WebLink
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-100 May 6, 2025 <br /> <br />GLF 7-05.5.DOCX 1 <br />7-05.5 Payment 2 <br /> 3 <br />Section 7-05.5 of the standard specifications is deleted and replaced with the following: 4 <br /> 5 <br />(******) 6 <br />Payment will be made for each of the following bid items that are included in the proposal: 7 <br /> 8 <br />“Adjust Manhole to Grade”, per each. 9 <br /> 10 <br />“Adjust Catch Basin/Inlet to Grade”, per each. 11 <br /> 12 <br />“Adjust Valve Box to Grade”, per each. 13 <br /> 14 <br />The payment for “Adjust Manhole to Grade”, “Adjust Catch Basin/Inlet to Grade”, shall be 15 <br />full compensation for all costs necessary to make the adjustment including temporary 16 <br />cover to adjust the existing structure to required elevation, construction of the asphalt 17 <br />transition around the structure, and restoration of the adjacent area. Adjustment of any 18 <br />structures twice will be paid as one adjustment. 19 <br /> 20 <br />END DIVISION7.RTF 21 <br /> 22 <br />END DIVISION 7 23 <br /> 24