My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST BID PROPOSAL: BID ITEM TABLE <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 April 24, 2025 <br /> <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the <br />unit price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform <br />thereto. All entries must be typed or entered in ink. <br /> <br />BID SCHEDULE <br /> BIDDER:___________________________ <br />Item <br />No. ITEM DESCRIPTION Unit Bid <br />Qty UNIT PRICE TOTAL AMOUNT <br />Broadway – California St to 18th St <br />1 Mobilization LS 1 $_______.___ $______________.___ <br />2 Flaggers (Minimum Bid Prevailing Wage) Hour 544 $_______.___ $______________.___ <br />3 Contractor Provided Uninformed Police Officer Hour 400 $_______.___ $______________.___ <br />4 Traffic Control Supervisor LS 1 $_______.___ $______________.___ <br />5 Other Traffic Control Labor Hour 160 $_______.___ $______________.___ <br />6 Construction Signs Class A SF 200 $_______.___ $______________.___ <br />7 Sequential Arrow Sign HR 220 $_______.___ $______________.___ <br />8 Portable Changeable Message Sign Hour 2,688 $_______.___ $______________.___ <br />9 Other Temporary Traffic Control Devices LS 1 $_______.___ $______________.___ <br />10 Planing Bituminous Pavement SY 39,574 $_______.___ $______________.___ <br />11 Additional Planing Bituminous Pavement SY 5,938 $_______.___ $______________.___ <br />12 HMA Class 1/2 Inch, PG 64-22 Ton 4,849 $_______.___ $______________.___ <br />13 Street Cleaning HR 90 $_______.___ $______________.___ <br />14 Adjust Manhole Each 21 $_______.___ $______________.___ <br />15 Adjust Catch Basin/Inlet to Grade Each 25 $_______.___ $______________.___ <br />16 Adjust Valve Box to Grade Each 7 $_______.___ $______________.___ <br />17 Adjust Existing Monument Castings to Grade Each 5 $_______.___ $______________.___ <br />18 Plastic Wide Line LF 1,525 $_______.___ $______________.___ <br />19 Plastic Line LF 21,740 $_______.___ $______________.___ <br />20 Plastic Traffic Arrow Each 57 $_______.___ $______________.___
The URL can be used to link to this page
Your browser does not support the video tag.