Laserfiche WebLink
SP-PAGE <br /> <br /> <br />2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST TABLE OF CONTENTS FOR SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 D May 6, 2025 <br /> <br /> Item Bids with Lump Sum for Incidentals ---------------------------------------------------- 64 1 <br />DIVISION 2 2 <br />EARTHWORK 3 <br />STREET CLEANING -------------------------------------------------------------------------------- 66 4 <br />DIVISION 5 5 <br />SURFACE TREATMENTS AND PAVEMENTS 6 <br /> Hot Mix Asphalt ------------------------------------------------------------------------------------ 68 7 <br /> Asphalt Cost Price Adjustment ----------------------------------------------------------------- 96 8 <br />DIVISION 7 9 <br />DRAINAGE STRUCTURES, STORM SEWERS, SANITARY 10 <br />SEWERS, WATER MAINS, AND CONDUITS 11 <br />MANHOLES, INLETS, CATCH BASINS, AND DRYWELLS ------------------------------- 98 12 <br /> Construction Requirements --------------------------------------------------------------------- 98 13 <br /> Adjusting Manholes and Catch Basins to Grade ------------------------------------------- 98 14 <br /> Adjusting Valve Boxes to Grade --------------------------------------------------------------- 99 15 <br />7-05.4 Measurement ------------------------------------------------------------------------------ 99 16 <br />7-05.5 Payment ------------------------------------------------------------------------------------ 100 17 <br />DIVISION 8 18 <br />MISCELLANEOUS CONSTRUCTION 19 <br />RAISED PAVEMENT MARKERS --------------------------------------------------------------- 101 20 <br />MONUMENT CASES ------------------------------------------------------------------------------ 102 21 <br />8-13.1 Description --------------------------------------------------------------------------------- 102 22 <br />8-13.2 Vacant --------------------------------------------------------------------------------------- 102 23 <br />8-13.3 Construction Requirements ------------------------------------------------------------ 102 24 <br />8-13.4 Measurement ------------------------------------------------------------------------------ 102 25 <br />8-13.5 Payment ------------------------------------------------------------------------------------ 102 26 <br />ILLUMINATION, TRAFFIC SIGNAL SYSTEMS, INTELLIGENT TRANSPORTATION 27 <br />SYSTEMS, AND ELECTRICAL ------------------------------------------------------------ 103 28 <br /> Materials -------------------------------------------------------------------------------------------- 103 29 <br /> Fiber Optic Cable, Electrical Conductors, and Cable ------------------------------------ 103 30 <br />9-29.18 Vehicle Detector -------------------------------------------------------------------------- 104 31 <br /> Construction Requirements -------------------------------------------------------------------- 114 32 <br /> Signal Systems ----------------------------------------------------------------------------------- 114 33 <br /> Induction Loop Vehicle Detectors ------------------------------------------------------------ 114 34