Laserfiche WebLink
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-44 May 6, 2025 <br /> <br />CELL PHONE: 1 <br />EMAIL: INFO@RUBATINO.COM 2 <br />MAILING 3 <br />ADDRESS: P.O. BOX 1029 4 <br /> EVERETT, WA 98206 5 <br /> 6 <br />SILVER LAKE WATER DISTRICT 7 <br />ATTENTION: SCOTT SMITH 8 <br />DESK PHONE: (425) 337-3647 EXT. 216 9 <br />CELL PHONE: 10 <br />EMAIL: SSMITH@SLWSD.COM 11 <br />ADDRESS: 15205 41ST AVE SE 12 <br /> BOTHELL, WA 98201-6114 13 <br /> 14 <br /> 15 <br />SNOHOMISH COUNTY PUD #1 16 <br />ATTENTION: ANDRA SHAUGHNESSY FLAHERTY 17 <br />DESK PHONE: (425) 783-4419 18 <br />CELL PHONE: (425) 345-0312 19 <br />EMAIL: ALFLAHERTY@SNOPUD.COM 20 <br />ADDRESS: P.O. BOX 1107 21 <br /> EVERETT, WA 98206 22 <br /> 23 <br />WAVE/ASTOUND COMMUNICATION 24 <br />ATTENTION: JIM BIGGS 25 <br />DESK PHONE: (206) 786-8720 26 <br />CELL PHONE: 27 <br />EMAIL: JIM.BIGGS@ASTOUND.COM 28 <br /> WA-CONSTRUCTION@ASTOUND.COM 29 <br />ADDRESS: 4766 1ST AVE S 30 <br /> SEATTLE, WA 98134 31 <br />*** 32 <br /> 33 <br />f1-07.17.OPT2.FR1.docx 34 <br />(October 3, 2022) 35 <br />Locations and dimensions shown in the Plans for existing facilities are in accordance with 36 <br />available information obtained without uncovering, measuring, or other verification. 37 <br /> 38 <br />Public and private utilities, or their Contractors, will furnish all work necessary to adjust, 39 <br />relocate, replace, or construct their facilities unless otherwise provided for in the Plans or 40 <br />these Special Provisions. Such adjustment, relocation, replacement, or construction will 41 <br />be done during the prosecution of the work for this project. It is anticipated that utility 42 <br />adjustment, relocation, replacement, or construction within the project limits will be 43 <br />completed as follows: 44 <br /> 45 <br />*** Contractor shall, per specifications 7-05 and 8-13, Adjust Manhole to Grade, 46 <br />Adjust Catch Basin/Inlet to Grade, Adjust Water Valve Box to Grade, and Adjust 47 <br />Existing Monument Castings to Grade. *** 48 <br /> 49 <br />The Contractor shall attend a mandatory utility preconstruction meeting with the Engineer, 50 <br />all affected subcontractors, and all utility owners and their Contractors prior to beginning 51 <br />onsite work. 52