My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-66 May 6, 2025 <br /> <br /> 1 <br /> 2 <br />DIVISION2.GR2 3 <br />Division 2 4 <br />Earthwork 5 <br /> 6 <br />GLF 2-08.DOCX 7 <br />2-08 STREET CLEANING 8 <br />(******) 9 <br /> 10 <br />Section 2-08 of the standard specifications is vacant shall be replaced by the following: 11 <br /> 12 <br />2-08.1 Description 13 <br /> 14 <br />This work shall consist of sweeping all construction related roads, and cleaning the 15 <br />pavement and removing debris from the roadway. 16 <br /> 17 <br />2-08.2 Vacant 18 <br /> 19 <br />2-08.3 Construction Requirements 20 <br /> 21 <br />The use of water to perform street sweeping work shall be held to a minimum unless 22 <br />designated otherwise by the Engineer. The contractor shall provide self-propelled pickup 23 <br />sweepers and/or vacuum pick up sweepers for pavement cleaning and debris removal 24 <br />whenever their use is ordered by the Engineer. The type and number of sweepers are 25 <br />subject to the approval of the Engineer. 26 <br /> 27 <br />Daily sweeping shall continue on all construction related roads at least once per day until 28 <br />said surface is covered with new HMA. In the event the Contractor sweeper will not be 29 <br />able to work daily on ground surfaces, the City Forces will provide services, and the 30 <br />Contractor will be billed for each hour of operation. 31 <br /> 32 <br />The following work shall not be paid by “Street Cleaning”, it shall be included in the bid 33 <br />item “Planing Bituminous Pavement” (2” Deep), per square yard: 34 <br /> 35 <br />1. Sweepers following the grinding work. 36 <br />2. Debris left in the road or on the side of the road from Planing Bituminous 37 <br />Pavement. 38 <br /> 39 <br />The Contractor shall plan the operation to minimize the need for street cleaning. 40 <br /> 41 <br />2-08.4 Measurement 42 <br /> 43 <br />Street cleaning will be measured by the hour for the actual time consumed in sweeping, 44 <br />pavement cleaning, and debris removal. No allowance will be made for time consumed 45 <br />in making repairs to the equipment or for moving the equipment to or from the site on 46 <br />which the street cleaning is ordered. No separate payment will be made for water 47 <br />required for the normal operation of the pickup sweepers. 48 <br /> 49
The URL can be used to link to this page
Your browser does not support the video tag.