2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-77 May 6, 2025 <br /> <br />being moved to the HMA plant for processing into the final mixture. Different aggregate 1 <br />sizes shall be kept separated until they have been delivered to the HMA plant. 2 <br /> 3 <br />5-04.3(5)A Vacant 4 <br /> 5 <br />5-04.3(6) Mixing 6 <br />After the required amount of mineral materials, asphalt binder, recycling agent and anti-7 <br />stripping additives have been introduced into the mixer the HMA shall be mixed until 8 <br />complete and uniform coating of the particles and thorough distribution of the asphalt 9 <br />binder throughout the mineral materials is ensured. 10 <br /> 11 <br />When discharged, the temperature of the HMA shall not exceed the optimum mixing 12 <br />temperature by more than 25°F as shown on the reference mix design report or as 13 <br />approved by the Engineer. Also, when a WMA additive is included in the manufacture of 14 <br />HMA, the discharge temperature of the HMA shall not exceed the maximum 15 <br />recommended by the manufacturer of the WMA additive. A maximum water content of 2 16 <br />percent in the mix, at discharge, will be allowed providing the water causes no problems 17 <br />with handling, stripping, or flushing. If the water in the HMA causes any of these 18 <br />problems, the moisture content shall be reduced as directed by the Engineer. 19 <br /> 20 <br />Storing or holding of the HMA in approved storage facilities will be permitted with 21 <br />approval of the Engineer, but in no event shall the HMA be held for more than 24 hours. 22 <br />HMA held for more than 24 hours after mixing shall be rejected. Rejected HMA shall be 23 <br />disposed of by the Contractor at no expense to the Contracting Agency. The storage 24 <br />facility shall have an accessible device located at the top of the cone or about the third 25 <br />point. The device shall indicate the amount of material in storage. No HMA shall be 26 <br />accepted from the storage facility when the HMA in storage is below the top of the cone 27 <br />of the storage facility, except as the storage facility is being emptied at the end of the 28 <br />working shift. 29 <br /> 30 <br />Recycled asphalt pavement (RAP) utilized in the production of HMA shall be sized prior 31 <br />to entering the mixer so that a uniform and thoroughly mixed HMA is produced. If there is 32 <br />evidence of the recycled asphalt pavement not breaking down during the heating and 33 <br />mixing of the HMA, the Contractor shall immediately suspend the use of the RAP until 34 <br />changes have been approved by the Engineer. After the required amount of mineral 35 <br />materials, RAP, new asphalt binder and asphalt rejuvenator have been introduced into 36 <br />the mixer the HMA shall be mixed until complete and uniform coating of the particles and 37 <br />thorough distribution of the asphalt binder throughout the mineral materials, and RAP is 38 <br />ensured. 39 <br /> 40 <br />5-04.3(7) Spreading and Finishing 41 <br />The mixture shall be laid upon an approved surface, spread, and struck off to the grade 42 <br />and elevation established. HMA pavers complying with Section 5-04.3(3) shall be used 43 <br />to distribute the mixture. Unless otherwise directed by the Engineer, the nominal 44 <br />compacted depth of any layer of any course shall not exceed the following: 45 <br /> 46 <br />HMA Class 1” 0.35 feet 47 <br />HMA Class ¾” and HMA Class ½” 48