My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-77 May 6, 2025 <br /> <br />being moved to the HMA plant for processing into the final mixture. Different aggregate 1 <br />sizes shall be kept separated until they have been delivered to the HMA plant. 2 <br /> 3 <br />5-04.3(5)A Vacant 4 <br /> 5 <br />5-04.3(6) Mixing 6 <br />After the required amount of mineral materials, asphalt binder, recycling agent and anti-7 <br />stripping additives have been introduced into the mixer the HMA shall be mixed until 8 <br />complete and uniform coating of the particles and thorough distribution of the asphalt 9 <br />binder throughout the mineral materials is ensured. 10 <br /> 11 <br />When discharged, the temperature of the HMA shall not exceed the optimum mixing 12 <br />temperature by more than 25°F as shown on the reference mix design report or as 13 <br />approved by the Engineer. Also, when a WMA additive is included in the manufacture of 14 <br />HMA, the discharge temperature of the HMA shall not exceed the maximum 15 <br />recommended by the manufacturer of the WMA additive. A maximum water content of 2 16 <br />percent in the mix, at discharge, will be allowed providing the water causes no problems 17 <br />with handling, stripping, or flushing. If the water in the HMA causes any of these 18 <br />problems, the moisture content shall be reduced as directed by the Engineer. 19 <br /> 20 <br />Storing or holding of the HMA in approved storage facilities will be permitted with 21 <br />approval of the Engineer, but in no event shall the HMA be held for more than 24 hours. 22 <br />HMA held for more than 24 hours after mixing shall be rejected. Rejected HMA shall be 23 <br />disposed of by the Contractor at no expense to the Contracting Agency. The storage 24 <br />facility shall have an accessible device located at the top of the cone or about the third 25 <br />point. The device shall indicate the amount of material in storage. No HMA shall be 26 <br />accepted from the storage facility when the HMA in storage is below the top of the cone 27 <br />of the storage facility, except as the storage facility is being emptied at the end of the 28 <br />working shift. 29 <br /> 30 <br />Recycled asphalt pavement (RAP) utilized in the production of HMA shall be sized prior 31 <br />to entering the mixer so that a uniform and thoroughly mixed HMA is produced. If there is 32 <br />evidence of the recycled asphalt pavement not breaking down during the heating and 33 <br />mixing of the HMA, the Contractor shall immediately suspend the use of the RAP until 34 <br />changes have been approved by the Engineer. After the required amount of mineral 35 <br />materials, RAP, new asphalt binder and asphalt rejuvenator have been introduced into 36 <br />the mixer the HMA shall be mixed until complete and uniform coating of the particles and 37 <br />thorough distribution of the asphalt binder throughout the mineral materials, and RAP is 38 <br />ensured. 39 <br /> 40 <br />5-04.3(7) Spreading and Finishing 41 <br />The mixture shall be laid upon an approved surface, spread, and struck off to the grade 42 <br />and elevation established. HMA pavers complying with Section 5-04.3(3) shall be used 43 <br />to distribute the mixture. Unless otherwise directed by the Engineer, the nominal 44 <br />compacted depth of any layer of any course shall not exceed the following: 45 <br /> 46 <br />HMA Class 1” 0.35 feet 47 <br />HMA Class ¾” and HMA Class ½” 48
The URL can be used to link to this page
Your browser does not support the video tag.