My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1313 75TH ST SW 2025-07-14
>
Address Records
>
75TH ST SW
>
1313
>
1313 75TH ST SW 2025-07-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 8:20:29 AM
Creation date
7/10/2025 8:20:29 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1313
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(E)SWITCHBOARD'MDS2' = CASE <br /> Pia.HA NAME Hmcm PROUB.T#. =13 <br /> LOCATION FEDFROM:2500 N/A SNOOD PTIDXFMR (Pr ENGINEERING <br /> NOTE CKT CIRCUT NAME CB SIZE LOAD(KVA) ELECTRICAL I LIGHTING I TELECOM I SECURITY <br /> NO B AMP R H M L K O TOTA PANEL DESCRIPTION <br /> 2 1 EOUR.Bdf LOAD A 800 3 99.32 99.32 RAI�ELAMPS: 4000 19515 North Creek Parkway,Suite 302 <br /> B - 95.72 96.72 FBEDRAMPS: 4000 Bothell,WA 98011 <br /> C - 96.70 98.70 L-L VOLTS: 480 425-402-9400 office@caseeng.com <br /> 2 SPARE A 800 3 L-N VOLTS: 277 <br /> B - PHASE. 3 <br /> C - VdRE 4 <br /> 2 3 EQUIPMENT LOAD A 800 3 99.32 99.32 <br /> B - - 99.32 99.32 <br /> - C - 101.30 101.30 pgLS <br /> 4 SPARE A 800 3 MLO.F-J <br /> B -. -. MAIN CB X 4000A `0p1 W74pt tr' <br /> C FLUSH <br /> 2,3 5 HVACLOAD A 800 3 892 8919 SURFACE <br /> - B - - 89.2 -- 89.19 ISO GFD <br /> C _ _ 89.21 89A9 FEED THRl1 90 R¢c �Fb� <br /> 6 SPARE A 800 13 1 1 1 ONAL <br /> SI B - - 6.27.24 C <br /> 7 SHACEON.Y A - 3 LOADS IM MARY <br /> B (TOTAL,ALL S�TIONS) <br /> C - <br /> 8 SPACEON_Y A - 3 RIB;KVA. <br /> B - HEAT KVA <br /> C - MOTOR KVA: 267.58 <br /> LIGHTING KVA <br /> KrrCHB4 KVA <br /> OTHER KVA: 594.68 <br /> PI-ASEA KVA: 28784 <br /> AMPS: 1039.1 <br /> PHASE B KVA: 285.24 <br /> AMPS 1029.7 <br /> H-IASECKVA: 219.19 <br /> AMPS: 1044.0 <br /> CONJB:IED LOAD <br /> KVA:' 862.27 <br /> AMPS1037.1 <br /> BAANDLOAD <br /> KVA: 834.56 <br /> AMPS 1064.0 <br /> NOTES(REMARKS: DEMAND I OV ERSITY FACTORS <br /> 1. EOSTING LOAD LOAD DESCRIPTION DEMAND <br /> 2. NEW LOAD R RECEPTACLES-TO 10KVA 1001A _ <br /> 3. SET H2FAJ®i LONG TIM ETD 60%. REMINNS OVER 10KVA 50% _ <br /> H HEATING 100. _ <br /> M MOTORS 100% = 178.39 <br /> LM LARGEST MOTOR 125% = 111.49 <br /> LM LIGHTING 125°b = <br /> K wCHEN 100% _ <br /> O OTHER 100% = 694.68 <br /> Rev.#: Revision: Dale: <br /> 6.20.24 <br /> Permit Set 6.24.24 <br /> Permit Set 6.27.24 <br /> Project Title: <br /> Tenant Improvement for: <br /> Phase 2 <br /> 1313 75th St.SW. <br /> Everett,WA 98203 <br /> Sheet Title: <br /> PANEL SCHEDULES <br /> Designed By: TN <br /> Drawn By: TN <br /> Project No: 24196 <br /> Date: 6/27/2024 <br /> Sheet Number: <br /> E 10.1 PH2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.