My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8102 EVERGREEN WAY Geotech Report 2025-08-04
>
Address Records
>
EVERGREEN WAY
>
8102
>
Geotech Report
>
8102 EVERGREEN WAY Geotech Report 2025-08-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 1:23:34 PM
Creation date
7/15/2025 9:48:44 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8102
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
473
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DevCo, Inc. ES-6516 <br /> April 1, 2019 Page 12 <br /> Final pavement design recommendations, including recommendations for heavy traffic areas, <br /> access roads, and frontage improvement areas, can be provided once final traffic loading has <br /> been determined. Road standards utilized by the governing jurisdiction may supersede the <br /> recommendations provided in this report. The HMA, ATB, and CRIB materials should conform to <br /> WSDOT specifications. All soil base material should be compacted to a relative compaction of <br /> 95 percent, based on the laboratory maximum dry density as determined by ASTM D1557. <br /> Utility Support and Trench Backfill <br /> In our opinion, on-site soils will generally be suitable for support of utilities. Remedial measures <br /> may be necessary in some areas to provide support for utilities, such as overexcavation and <br /> replacement with structural fill and/or placement of geotextile fabric. Groundwater seepage may <br /> be encountered within utility excavations, and caving of trench walls may occur where <br /> groundwater is encountered. Depending on the time of year and conditions encountered, <br /> dewatering, as well as temporary trench shoring, may be necessary during utility excavation and <br /> installation. <br /> Using on-site soils successfully as structural backfill throughout utility trench excavations will <br /> depend on the moisture content at the time of placement and compaction. Moisture conditioning <br /> of the soils may be necessary at some locations prior to use as structural fill. Each section of the <br /> utility lines must be adequately supported in the bedding material. Utility trench backfill should <br /> be placed and compacted to the specifications of structural fill as previously detailed in this report, <br /> or to the applicable specifications of the responsible jurisdiction or agency. <br /> LIMITATIONS <br /> The recommendations and conclusions provided in this study are professional opinions <br /> consistent with the level of care and skill that is typical of other members in the profession <br /> currently practicing under similar conditions in this area. A warranty is neither expressed nor <br /> implied. Variations in the soil and groundwater conditions observed at the boring locations may <br /> exist and may not become evident until construction. ESNW should reevaluate the conclusions <br /> provided in this study if variations are encountered. <br /> Additional Services <br /> ESNW should have an opportunity to review final project plans with respect to the geotechnical <br /> recommendations provided in this report. ESNW should also be retained to provide testing and <br /> consultation services during construction. <br /> Earth Solutions NW, LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.