Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Slab 4 and 5.Slabs complete.Upload special inspection reports. <br /> 7/19/2023 7/19/2023 BLDG 03- RAKEEB KHAN PARTIAL eTRAKiT Inspection Request <br /> FOUNDATION WALL APPROVAL <br /> Notes: <br /> 7/14/2023 5:10 PM SIERRA CONSTRUCTION CO INC <br /> First panel rebar inspection. <br /> Contact Name:SIERRA CONSTRUCTION CO INC <br /> Site Address:1215 80TH ST SW <br /> Phone:4254875200 <br /> e-Mail:mitchk@sierraind.com <br /> First set of wall panels(69-80 and 63-65).Upload special inspection reports.Spot checked a couple panels. <br /> 7/25/2023 77/25/2023 BLDG 03- RAKEEB KHAN ACCEPTED see notes <br /> FOUNDATION WALL <br /> Notes: <br /> 7/20/2023 8:35 AM SIERRA CONSTRUCTION CO INC <br /> Requesting a tilt panel rebar inspection prior to special inspection. <br /> Contact Name:SIERRA CONSTRUCTION CO INC <br /> Site Address:1215 80TH ST SW <br /> Phone:4254875200 <br /> e-Mail:mitchk@sierraind.com <br /> See special inspection report.Continue to upload special inspection reports. <br /> 8/8/2023 8/8/2023 BLDG 02- Matt Schreifels PARTIAL see notes <br /> FOOTING/SETBACK APPROVAL <br /> Notes: <br /> 8/7/2023 8:17 AM SIERRA CONSTRUCTION CO INC <br /> Cont footing rebar inspection <br /> Contact Name:SIERRA CONSTRUCTION CO INC <br /> Site Address:1215 80TH ST SW <br /> Phone:4254875200 <br /> e-Mail:mitchk@sierraind.com <br /> Cont footing rebar inspection. Footing concrete has been poured.Upload special inspection report. <br /> 8/16/2023 78/16/2023 BLDG 03- RAKEEB KHAN PARTIAL eTRAKiT Inspection Request <br /> FOUNDATION WALL APPROVAL <br /> Notes: <br /> 8/15/2023 7:31 AM SIERRA CONSTRUCTION CO INC <br /> Cont footing inspection <br /> Contact Name:SIERRA CONSTRUCTION CO INC <br /> Site Address:1215 80TH ST SW <br /> Phone:4254875200 <br /> e-Mail:mitchk@sierraind.com <br /> Continue uploading special inspection reports. <br /> I <br /> Printed:Wednesday,09 April, 2025 3 of 7 rk <br /> SUPERION <br />