My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1215 80TH ST SW 2025-08-22
>
Address Records
>
80TH ST SW
>
1215
>
1215 80TH ST SW 2025-08-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2025 9:09:38 AM
Creation date
7/16/2025 11:57:04 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1215
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2955
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Slab 4 and 5.Slabs complete.Upload special inspection reports. <br /> 7/19/2023 7/19/2023 BLDG 03- RAKEEB KHAN PARTIAL eTRAKiT Inspection Request <br /> FOUNDATION WALL APPROVAL <br /> Notes: <br /> 7/14/2023 5:10 PM SIERRA CONSTRUCTION CO INC <br /> First panel rebar inspection. <br /> Contact Name:SIERRA CONSTRUCTION CO INC <br /> Site Address:1215 80TH ST SW <br /> Phone:4254875200 <br /> e-Mail:mitchk@sierraind.com <br /> First set of wall panels(69-80 and 63-65).Upload special inspection reports.Spot checked a couple panels. <br /> 7/25/2023 77/25/2023 BLDG 03- RAKEEB KHAN ACCEPTED see notes <br /> FOUNDATION WALL <br /> Notes: <br /> 7/20/2023 8:35 AM SIERRA CONSTRUCTION CO INC <br /> Requesting a tilt panel rebar inspection prior to special inspection. <br /> Contact Name:SIERRA CONSTRUCTION CO INC <br /> Site Address:1215 80TH ST SW <br /> Phone:4254875200 <br /> e-Mail:mitchk@sierraind.com <br /> See special inspection report.Continue to upload special inspection reports. <br /> 8/8/2023 8/8/2023 BLDG 02- Matt Schreifels PARTIAL see notes <br /> FOOTING/SETBACK APPROVAL <br /> Notes: <br /> 8/7/2023 8:17 AM SIERRA CONSTRUCTION CO INC <br /> Cont footing rebar inspection <br /> Contact Name:SIERRA CONSTRUCTION CO INC <br /> Site Address:1215 80TH ST SW <br /> Phone:4254875200 <br /> e-Mail:mitchk@sierraind.com <br /> Cont footing rebar inspection. Footing concrete has been poured.Upload special inspection report. <br /> 8/16/2023 78/16/2023 BLDG 03- RAKEEB KHAN PARTIAL eTRAKiT Inspection Request <br /> FOUNDATION WALL APPROVAL <br /> Notes: <br /> 8/15/2023 7:31 AM SIERRA CONSTRUCTION CO INC <br /> Cont footing inspection <br /> Contact Name:SIERRA CONSTRUCTION CO INC <br /> Site Address:1215 80TH ST SW <br /> Phone:4254875200 <br /> e-Mail:mitchk@sierraind.com <br /> Continue uploading special inspection reports. <br /> I <br /> Printed:Wednesday,09 April, 2025 3 of 7 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.