Laserfiche WebLink
DAILY FIELD REPORT Inspection Date <br /> 06/23/2023 <br /> AAR TESTING AND INSPECTION, INC. <br /> 7126 180th Ave NE, Suite C101 Report Number <br /> Redmond, WA 98052 TG062323A <br /> 425-881-5812 <br /> CLIENT INFORMATION PROJECT INFORMATION <br /> Contact Tod Johnson Project No. 23-111 <br /> Company LMJ Enterprises Project Name Hyundai of Everett <br /> Address 11845 NE 85th ST Address 7800 Evergreen Way <br /> City Kirkland City Everett <br /> Contractor Foushee Permit No. B2204-005 <br /> INSPECTION TYPE(S) STRUCTURE(S) / LOCATION(S) <br /> Lateral Wood Framing Foundation Level Shear Walls <br /> Weather Start Time End Time <br /> Sunny 07:00 AM 10:00 AM <br /> DRAWINGS/ DOCUMENTS REFERENCED <br /> Approved Project Drawing Sheets S2.0 and S5.0 <br /> INSPECTION OBSERVATION / REMARKS <br /> As requested, I was on site and inspected shearwalls on the foundation level at grids grids A-C/1-5, 3/F.5, 1.5/5, K/3-5. <br /> Shearwall framing, anchors bolts to concrete, shear transfer connections at top of wall, holddown, sheathing, and nailing was found to be <br /> completed per plans and specifications. <br /> Exceptions: Walls at grids C/1.5, A/3.5, A.5/4, C/3.8, 3.5/5 and F.5/3 have penetrations in bottom plate or bottom plate ends before end wall. <br /> This to be corrected per plans or structural engineers directions. <br /> Report conforms with exceptions <br /> Exceptions Location <br /> Refer exception note above <br /> Exceptions Details <br /> Refer exception note above <br /> Reinspection Required? <br /> Yes <br /> Inspectors Name Report Date Reviewers Signature Reviewed By Reviewed Date <br /> Inspectors Signature Teajalam (TJ) 06/23/2023 Teajalam (TJ) Gounden <br /> AtlGounden <br /> c7409fd5cf43a857-1687534923838 <br />