Laserfiche WebLink
DAILY FIELD REPORT Inspection Date <br /> 05/16/2023 <br /> AAR TESTING AND INSPECTION, INC. <br /> 7126 180th Ave NE, Suite C101 Report Number <br /> Redmond, WA 98052 LDC051623C <br /> 425-881-5812 <br /> CLIENT INFORMATION PROJECT INFORMATION <br /> Contact Tod Johnson Project No. 23-111 <br /> Company LMJ Enterprises Project Name Hyundai of Everett <br /> Address 11845 NE 85th ST Address 7800 Evergreen Way <br /> City Kirkland City Everett <br /> Contractor Flushed Permit No. B2204-005 <br /> INSPECTION TYPE(S) STRUCTURE(S) / LOCATION(S) <br /> Reinforcing Steel Walls(3.5/L-K), footings (E and D/3; F-G/3; G-1/3; Annex rooms 132,133; Slab infills (rooms <br /> 101,103,109, 112); East slab on grade Welded wire fabric <br /> Proprietary Anchors- Epoxy Dowels Walls(3.5/L-K), footings (E and D/3; F-G/3; G-3/3; Annex rooms 132,133); Slab infills (rooms <br /> 101,103,109, 112) <br /> Weather Start Time End Time <br /> Cloudy 11:00 AM <br /> DRAWINGS/ DOCUMENTS REFERENCED <br /> SKS-1, S2.0, S1.1, ESR# 4057 <br /> INSPECTION OBSERVATION / REMARKS <br /> Verified epoxy to be Simpson SET-3G, exp: 11/1/24. Verified hole cleanliness and minimum embedments of 4". Observed placement of epoxy <br /> and #4 wall verticals, #4 horizontal slab dowels and footing dowels forming a fully encapsulated system at above noted locations. <br /> Verified reinforcing steel was placed in conformance for size, grade, spacing, splicing and clearances. Welded wire fabric at east slab on grade <br /> was placed per plan. <br /> Items inspected are in conformance with approved plans,specifications, and jurisdictional requirements <br /> Inspectors Name Report Date Reviewers Signature Reviewed By Reviewed Date <br /> Inspectors Signature Loren Chandler 05/18/2023 Teajalam (TJ) Gounden <br /> D6FC959E-63A7-4F9E-BOBA-285B453B3ABF <br />