Laserfiche WebLink
SANITARY SEWER STANDARD NOTES (CITY OF EVERETT): TESC STANDARD NOTES (CITY OF EVERETT): STORMWATER SOURCE CONTROL (CITY OF EVERETT): GENERAL NOTES (STORMTECH): <br /> A. ALL WORK AND MATERIALS SHALL CONFORM TO THE CITY OF EVERETT STANDARDS AND 1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL(ESC) PLAN DOES NOT STORMWATER SOURCE CONTROL MEASURES ARE REQUIRED TO PREVENT DISCHARGE OF <br /> WSDOT/APWA STANDARD SPECIFICATIONS. CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND POLLUTANTS TO SURFACE WATERS AND/OR GROUNDWATERS. SOURCE CONTROL MEASURES MAY 1. STORMTECH REQUIRES INSTALLING CONTRACTORS TO UNDERSTAND THE LATEST <br /> LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES). CONSIST OF ACTIVITIES OR ACTIONS TAKEN TO PREVENT DISCHARGES(OPERATIONAL BMPS) OR "STORMTECH SC-740 CONSTRUCTION GUIDE" PRIOR TO BEGINNING SYSTEM <br /> B. NO PART OF THE SANITARY SEWER SYSTEM SHALL BE COVERED, CONCEALED OR PUT INTO 2 THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, CONSTRUCTED MEASURES INTENDED TO PREVENT OR REMOVE POLLUTANTS IN STORMWATER INSTALLATION. <br /> . <br /> USE UNTIL IT HAS BEEN TESTED, INSPECTED, AND APPROVED BY THE CITY INSPECTOR. REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE RUNOFF (STRUCTURAL BMPS). SOURCE CONTROL BMPS SHALL BE IMPLEMENTED IN ACCORDANCE <br /> C. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE APPLICANT CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND WITH VOLUME 4 OF THE STORMWATER MANAGEMENT MANUAL AND THE REQUIREMENTS HEREIN. 2• STORMTECH OFFERS INSTALLATION CONSULTATIONS TO INSTALLING CONTRACTORS. <br /> RECORDS AND ARE SHOWN FOR CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE VEGETATION/LANDSCAPING IS ESTABLISHED. CONTACT OUR TECHNICAL SERVICE DEPARTMENT OF LOCAL STROMTECH REPRESENTATIVE <br /> FOR VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO ANY ADDITIONAL UTIUTIES NOT 4-5.1 APPLICABILITY AT LEAST 30 DAYS PRIOR TO SYSTEM INSTALLATION TO ARRANGE A PRE-INSTALLATION <br /> IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL 3. THE BOUNDARIES OF THE CLEARING UMITS SHOWN ON THIS PLAN SHALL BE CLEARLY 1. ALL DEVELOPMENT PROJECTS SHALL PROVIDE SOURCE CONTROL MEASURES TO THE CONSULTATION. OUR REPRESENTATIVES CAN THEN ANSWER QUESTIONS OR ADDRESS <br /> NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE APPROVED FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO EXTENT REQUIRED BY THE STORMWATER MANAGEMENT MANUAL AND AS NECESSARY TO COMMENTS ON THE STORMTECH CHAMBER SYSTEM AND INFORM THE INSTALLING <br /> DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE CONTRACTOR OF THE MINIMUM INSTALLATION REQUIREMENTS BEFORE BEGINNING THE <br /> BY THE CITY ENGINEER PRIOR TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE FLAGGING SHALL BE MAINTAINED BY THE APPLICANT CONTRACTOR FOR THE DURATION OF PREVENT ILLICIT DISCHARGES. <br /> PROJECT. / 2. NON-DEVELOPMENT ACTIVITIES WHICH HAVE POLLUTION GENERATING SOURCES. SYSTEM'S CONSTRUCTION. CALL 860-529-8188 TO SPEAK TO A TECHNICAL SERVICE <br /> CONSTRUCTION. 3. EXISTING LAND USES AND ACTIVITIES WITH POLLUTION GENERATING SOURCES. REPRESENTATIVE OR VISIT WWW.STORMTECH.COM TO RECEIVE A COPY OF OUR <br /> D. ALL SEWER MAIN EXTENSIONS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS MUST 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION NTH CONSTRUCTION GUIDE. <br /> BE STAKED BY SURVEY FOR UNE AND GRADE PRIOR TO STARTING CONSTRUCTION. ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT 4-5.2 DISCHARGE TO SANITARY SEWER <br /> SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, SOME OUTDOOR FACILITIES WHICH ARE KNOWN TO POSE A RISK OF POLLUTANT DISCHARGE ARE 3. STORMTECH REQUIREMENTS FOR SYSTEMS WITH PAVEMENT DESIGN: MINIMUM COVER IS <br /> ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. ENCOURAGED BY THE STORMWATER MANAGEMENT MANUAL TO DISCHARGE TO SANITARY SEWER 18" NOT INCLUDING PAVEMENT; SC-740 MAXIMUM COVER IS 8.0' INCLUDING PAVEMENT. <br /> STORM DRAINAGE STANDARD NOTES (CITY OF EVERETT): 5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR RATHER THAN SURFACE WATER SYSTEMS IF ALLOWED BY THE LOCAL JURISDICTION IN ORDER TO FOR INSTALLATIONS THAT DO NOT INCLUDE PAVEMENT, WHERE RUTTING FROM VEHICLES <br /> ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES PREVENT ILUCIT DISCHARGES. THE CITY WILL REQUIRE THAT THESE FACILITIES DISCHARGE TO MAY OCCUR, MINIMUM REQUIRED COVER IS INCREASED TO 30 <br /> 1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR PUT INTO USE SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE SANITARY SEWER TO THE EXTENT FEASIBLE. DISCHARGES TO SANITARY SEWER MUST MEET THE <br /> UNTIL IT HAS BEEN INSPECTED, TESTED, AND ACCEPTED BY THE CITY OF EVERETT. THAT SEDIMENT AND SEDIMENT-LADEN WATER DO NOT LEAVE THE SITE. REQUIREMENTS OF THE CITYS INDUSTRIAL PRETREATMENT ORDINANCE. REQUIREMENTS INCLUDE 4. THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH BEARING CAPACITY OF THE <br /> 2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND 6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE COVERS TO PREVENT STORMWATER FROM ENTERING THE SANITARY SEWER SYSTEM AND SUB-GRADE MATERIALS TO THE DESIGN ENGINEER. <br /> CONSTRUCTION STANDARDS AND SPECIFICATIONS AND THE WSDOT/APWA STANDARD APPUCANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY AFTER PRE-TREATMENT PRIOR TO DISCHARGE. <br /> SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION (CURRENT EDITION). STORM EVENTS. 5. AASHTO M288 CLASS 2 NON-WOVEN GEOTEXTILE (ADS601 OR EQUAL) (FILTER FABRIC) <br /> 7. 7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A THE FOLLOWING USES OR ACTIVITIES SHALL BE DESIGNED TO DISCHARGE TO THE SANITARY MUST BE USED AS INDICATED IN THE PLANS. <br /> 3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM SEWER SYSTEM: <br /> RECORDS AND ARE SHOWN FOR CONVENIENCE. THE CONTRACTOR SHALL BE EVENT. <br /> RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND T TRASH COMPACTORS AT INDUSTRIAL OR COMMERCIAL FACILITIES. 6. STONE PLACEMENT BETWEEN CHAMBER ROWS AND AROUND PERIMETER MUST FOLLOW <br /> AVOID DAMAGE TO ANY DUMPSTER ENCLOSURES ASSOCIATED WITH POLLUTION GENERATING MATERIALS. <br /> ADDITIONAL UTILITIES SHOWN. IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING 8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE INSTRUCTIONS AS INDICATED IN THE MOST CURRENT VERSION OF"STORMTECH SC-740 <br /> CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE DRAINS FROM CONTAINMENT PADS ON COVERED FUEL ISLANDS SHALL DRAIN TO A CONSTRUCTION GUIDE". <br /> ANY CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT SANITARY SEWER. <br /> COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT. LADEN WATER INTO THE DOWNSTREAM SYSTEM. VEHICLE WASHING FACIUTIES 7. BACKFILLING OVER THE CHAMBER MUST FOLLOW REQUIREMENTS AS INDICATED IN THE <br /> 4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS MUST BE 9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF FRUIT STORAGE AREAS MOST CURRENT VERSION OF*STORMTECH SC-740 CONSTRUCTION GUIDE°. <br /> STAKED BY SURVEY FOR LINE AND GRADE PRIOR TO STARTING CONSTRUCTION. CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL VEHICLE MAINTENANCE AND REPAIR AREAS <br /> MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR OUTSIDE MANUFACTURING ACTIVITIES <br /> 5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED 'DUMP NO WASTE, DRAINS THE DURATION OF THE PROJECT. INDUSTRIAL ROOF VENT CLEANING WASH WATER 8. THE CONTRACTOR MUST REFER TO "STORMTECH SC-740 CONSTRUCTION GUIDE" FOR A <br /> TO STREAM, LAKE, RIVER, PUGET SOUND, OR WETLAND." CHOOSE APPROPRIATE FEATURE TABLE OF ACCEPTABLE VEHICLE LOADS AT VARIOUS DEPTHS OF COVER. THIS <br /> FOR THE PROJECT. 10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND INFORMATION IS ALSO AVAILABLE ON THE STORMTECH WEBSITE: WWW.STORMTECH.COM. <br /> 6. SHALL COMPLY WITH THE EVERETT MUNICIPAL CODE (EMC), CITY ADOPTED STORMWATER SEDIMENT TRACKED OFF THE SITE. THE CONTRACTOR IS RESPONSIBLE FOR PREVENTING VEHICLES THAT EXCEED STORMTECH <br /> MANAGEMENT MANUAL, POLICIES AND CRITERIA SET FORTH IN THE CITY OF EVERETTS 11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE REQUIREMENTS FROM TRAVELING ACROSS OR PARKING OVER THE STORMWATER SYSTEM. <br /> DESIGN AND CONSTRUCTION STANDARDS& SPECIFICATIONS. WATER BODIES IF THE PROPOSED BMPS FAIL. IF BMPS FAIL AND SEDIMENT-LADEN WATER TEMPORARY FENCING, WARNING TAPE AND APPROPRIATELY LOCATED SIGNS ARE <br /> IS LEAVING THE SITE, IMMEDIATELY NOTIFY YOUR PUBLIC WORKS INSPECTOR. COMMONLY USED TO PREVENT UNAUTHORIZED VEHICLES FROM ENTERING SENSITIVE <br /> WATER STANDARD NOTES (CITY OF EVERETT): 12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR CONSTRUCTION AREAS. <br /> NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 9. THE CONTRACTOR MUST APPLY EROSION AND SEDIMENT CONTROL MEASURES TO <br /> A. NO CONNECTION TO THE EXISTING MAINS WILL BE ALLOWED EXCEPT BY MEANS OF AN 7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30. PROTECT THE STORMWATER SYSTEM DURING ALL PHASES OF SITE CONSTRUCTION PER <br /> APPROVED BACKFLOW PREVENTION DEVICE PRIOR TO SATISFACTORY FLUSHING, TESTING, 13. NOTIFY THE CITY PUBLIC WORKS INSPECTOR AT LEAST 24 HOURS PRIOR TO DEWATERING LOCAL CODES AND DESIGN ENGINEER'S SPECIFICATIONS. <br /> DISINFECTION, AND RECEIPT OF SATISFACTORY BACTERIOLOGICAL TEST RESULTS. ACTIVITIES. HANDLE HIGHLY TURBID OR OTHERWISE CONTAMINATED DEWATERING WATER <br /> B. CONNECTIONS TO AND TAPS ON EXISTING MAINS WILL BE MADE BY THE PUBLIC WORKS SEPARATELY FROM STORMWATER. 10. STORMTECH PROJECT WARRANTY IS LIMITED. CONTACT STORMTECH FOR WARRANTY <br /> DEPARTMENT AT THE DEVELOPER'S EXPENSE. THE PUBLIC WORKS DEPARTMENT SHALL 14. THE APPROVED PROJECT PUBLIC WORKS PERMIT AND SWPPP SHALL BE RETAINED ON INFORMATION. <br /> BE GIVEN AT LEAST 5 BUSINESS DAYS NOTICE FOR EACH CONNECTION. THE PUBLIC SITE OR READILY AVAILABLE TO THE CONTRACTOR THROUGHOUT THE DURATION OF THE <br /> WORKS DEPARTMENT SHALL THEREAFTER DETERMINE THE DATE AND TIME AT WHICH THE CONSTRUC11ON PROJECT. <br /> CONNECTION SHALL BE MADE. 15. DESIGN, INSTALL, IMPLEMENT, AND MAINTAIN EFFECTIVE POLLUTION PREVENTION <br /> C. ALL WORK AND MATERIALS MUST CONFORM TO CITY OF EVERETT STANDARDS. MEASURES TO MINIMIZE THE DISCHARGE OF POLLUTANTS. <br /> D. A PRE-CONSTRUCTION MEETING SHALL BE HELD WITH THE CITY PRIOR TO THE START OF 16. PROTECT ALL LID BMPS FROM SEDIMENTATION THROUGH INSTALLATION AND MAINTENANCE <br /> CONSTRUCTION. THE CITY OF EVERETT PUBLIC WORKS CONSTRUCTION DIVISION MUST BE OF EROSION AND SEDIMENT CONTROL BMPS ON PORTIONS OF THE SITE THAT DRAIN INTO <br /> NOTIFIED AT LEAST 24 HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION. THE UD BMPS. <br /> E. THE DEVELOPER OR THE DEVELOPERS AUTHORIZED AGENT SHALL NOTIFY THE PUBUC <br /> WORKS DEPARTMENT OF A PERSON WHO CAN BE CONTACTED REGARDING PROBLEMS <br /> DURING CONSTRUCTION ON A 24 HOUR BASIS. <br /> F. MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES VERTICAL SEPARATION <br /> BETWEEN POTABLE AND NON-POTABLE CONVEYANCE SYSTEMS. <br /> G. ALL CITY OF EVERETT VALVES SHALL BE OPERATED BY PUBLIC WORKS DEPARTMENT <br /> PERSONNEL ONLY. ALL VALVES, NEW AND EXISTING, SHALL BE ACCESSIBLE AT ALL <br /> TIMES. <br /> g <br /> 1 3/30/22 TJP KEC JOE CONSTRUCTION DOCUMENTS DRAWN BY DESIGNED BY <br /> AST/KWP TJP apN EBEh LMJ HYUNDAI SHEET <br /> 2 10/4/22 TJP KEC JDE PUBLIC WORKS PERMIT RESUBMITTAL #1 CHECKED BY APPROVED BY Call 811 Z, `�d��oq� 7800 EVERGREEN WAY, EVERETT <br /> two business days dig <br /> 6th Avenue,Suite 1600 ' o <br /> 3 11/23/22 TJP KEC JDE PUBLIC WORKS PERMIT RESUBMITTAL #2 KEC JDE before youdig seatde,wA9slo1 Co O <br /> opeRecrsr <br /> DATE 2OW.622.5822 <br /> 11/23 2022 kptf.com „� Q GENERAL NOTES • <br /> SCALE: 9 ¢R�D`��' <br /> SsfONAL <br /> NO. DATE BY CHID. APPR. REVISION J 0 B No. : 2100507 AS SHOWN 1/23/2022 <br />