Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 4/27/2023 4/27/2023 BLDG 02- RAKEEB KHAN PARTIAL eTRAKiT Inspection Request <br /> FOOTING/SETBACK APPROVAL <br /> Notes: <br /> 4/26/2023 9:00 AM Chris Denchfield <br /> Contact Name:Chris Denchfield <br /> Site Address:7800 EVERGREEN WAY <br /> Phone:4254669681 <br /> e-Mail:cdenchfield@foushee.com <br /> rescheduled from 5/4 to 4/27 <br /> Upload special inspection reports for the foundation to the permit. Note:Footings at thickened edge not ready.Reschedule foundation inspection when <br /> ready. <br /> 5/16/2023 5/16/2023 BLDG 02- RAKEEB KHAN PARTIAL eTRAKiT Inspection Request <br /> FOOTING/SETBACK APPROVAL <br /> Notes: <br /> 5/8/2023 6:54 AM Chris Denchfield <br /> Contact Name:Chris Denchfield <br /> Site Address:7800 EVERGREEN WAY <br /> Phone:4254669681 <br /> e-Mail:cdenchfield@foushee.com <br /> Provide special inspection report. Note ufer inspected by electrical inspector. <br /> 6/26/2023 6/26/2023 BLDG 07-EXTERIOR FMatt Schreifels PARTIAL <br /> SHEAR APPROVAL <br /> Notes: <br /> 6/12 exterior shear inspected. Upload special inspections report for shear walls with nailing of 4"on center or less. <br /> 6/26/2023 6/26/2023 BLDG 08-FRAMING Matt Schreifels NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 6/22/2023 6:45 AM Griffin Scheuer <br /> Contact Name:Griffin Scheuer <br /> Site Address:7800 EVERGREEN WAY <br /> Phone:4253933057 <br /> e-Mail:gscheuer@foushee.com <br /> Need all sub permits rough-in approval prior to framing inspection.Reschedule for framing inspection once sub permits have been approved <br /> 6/26/2023 6/26/2023 BLDG 14-ROOF Matt Schreifels PARTIAL <br /> NAILING APPROVAL <br /> Notes: <br /> Excluding extension of existing roof line north of grid C-1 to C-3. <br /> I <br /> Printed:Tuesday,02 January,2024 2 of 7 rk <br /> SUPERION <br />