Laserfiche WebLink
GENERAL NOTES-DEMOLITION ROOF PLAN FREIHEIT <br /> 1.PRIOR TO DEMOLITION,GENERAL CONTRACTOR TO VISIT THE SITE AND VERIFY EXTENT OF <br /> DEMOLITION ACTIVITIES REQUIRED FOR NEW CONSTRUCTION ARCHITECTURE <br /> 2.REMOVE ALL DEBRIS AND GARBAGE PRIOR TO START OF CONSTRUCTION.REPAIR SUBSTRATES AS <br /> RQUIRED FOR NEW FINISHES <br /> 3.COORDINATE CONSTRUCTION SCHEDULE WITH ARCHITECT AND BUILDING OWNER TO MINIMIZE <br /> DISRUPTIONS TO BUSINESS HOUR OPERATIONS <br /> 4.THE CONTRACTOR SHALL ENSURE THAT THIS PROJECT AND ALL CONSTRUCTION ACTIVITIES RELATED <br /> THERETO CONFORM WITH ALL LOCAL,REGIONAL,STATE AND/OR FEDERAL REGULATIONS PERTAINING <br /> TO DISTURBING,DISPLACING,AND/OR REMOVAL OF ASBESTOS OR ASBESTOS CONTAINING MATERIALS. <br /> NOTE SPECIFICALLY THAT FOR PROJECTS IN WASHINGTON STATE,THE CONTRACTOR SHALL CONFORM <br /> TO THE REQUIREMENTS OF THE PUGET SOUND AIR POLLUTION CONTROL AGENCY REGARDING <br /> INSPECTION,CERTIFICATION,AND NOTIFICATION <br /> 5.ALL SALVAGED ITEMS SHALL BE RETURNED TO BUILDING OWNER AT OWNER'S OPTION.ALL <br /> UNWANTED MATERIAL SHALL BE DISPOSED OF PROPERLY <br /> 6.DEMO ALL EXISTING IMPROVEMENTS AND FIXTURES AS NECESSARY TO ACCOMMODATE NEW WORK <br /> 7.PROTECT ALL AREAS OF BUIDLING AND HVAC SYSTEM FROM DUST AND DEBRIS AT ALL TIMES; <br /> PROTECT ANY ITEMS TO REMAIN AGAINST DAMAGE DURING CONSTRUCTION <br /> 8.ALL ABANDONED FASTENERS AND ANCHORS SHALL BE REMOVED FROM ALL WALL SURFACES,AND <br /> WALLS TO BE PATCHED/REPAIRED AS NECESSARY <br /> 9.ALL DEMOLISHED AND UNUSED CABLE AND WIRING TO BE DEMOLISHED BACK TO SOURCE J <br /> W <br /> 10.DEMO ALL ELECTRICAL AND PLUMBING WITHIN DEMOLISHED WALLS.REROUTE UTILITIES IN NEW OR 0 <br /> REMAINING WALLS PER FLOOR PLAN <br /> 11.DEMOLISH FLOORING AND WALL BASE THROUGHOUT,UNLESS NOTED OTHERWISE.PREP TO O <br /> RECEIVE NEW FLOOR MATERIALS 7- <br /> 12.DEMOLISH EXISTING CEILING GRID,ACOUSTIC TILES,GWB CEILINGS&SOFFITS,AND LIGHTING W <br /> THROUGHOUT,UNLESS NOTED OTHERWISE ON THE REFLECTED CEILING PLAN. n/ <br /> 13.EXISTING WINDOW TREATMENTS TO REMAIN.CONTRACTOR TO REMOVE PRIOR TO DEMOLITION, LL <br /> CLEAN,AND REINSTALL AFTER ALL WORK IS COMPLTED,UNLESS NOTED OTHERWISE W <br /> LEGEND-DEMOLITION PLAN <br /> NO WORK THIS AREA Q <br /> EXTENTS OF <br /> DEMOLITION EXISTING SHOWROOM <br /> EXISTINELEMENT CONSTRUCTION <br /> TO REMAIN / <br /> O <br /> EXISTING CONSTRUCTION/ O <br /> ELEMENT TO BE REMOVED <br /> I_ KEYNOTES-DEMOLITION ROOF PLAN Q <br /> RD-01 REMOVE EXTENT OF ROOF ON EXISTING SHOWROOM PER HATCH AREA. Z � <br /> RD-02 EXISTING METAL ROOF TO REMAIN.PROTECT THROUGHOUT CONSTRUCTION. <br /> RD-03 EXISTING ROOF TO REMAIN PROTECT THROUGHOUT CONSTRUCTION. 2 w � <br /> RD-04 REMOVE EXISTING ROOF EVES TO ACCOMMODATE NEW PARAPET.SEE ROOF PLAN FOR <br /> to- - - - - - - - - - - - - - - - - - - - - - - - - - ADDITIONAL INFORMATION. (D a <br /> Lu <br /> LU LU <br /> o- - - - - - - - - - - - - -- - - - - - - - - - - - - - - >- CD W <br /> 2 RD-03 = w <br /> RD-02 <br /> ------------------- <br /> I I I I I I I I I I I <br /> iz�aa <br /> FSTERED <br /> ITECT <br /> RD-01�� u <br /> MICHAEL J. L TON <br /> STATE OF WASHINGTON <br /> -JIF------------ _____4_______`______`_ ISSUE LIST <br /> — — — — — — — — — — — — — — — — — — — — — — — — PERMIT SUBMITTAL 03.31.2022 <br /> PRICING UPDATE 08.09.2022 <br /> 1 BLDG REVISION 09.30.2022 <br /> 2 PW REVISION 10.04.2022 <br /> o— — — — — — — — — — — — — — — — — — — — — — — — — — — 3 PLANNING/PW REVISION 11.23.2022 <br /> I I I I I I I I I I I I <br /> 8 <br /> DEMOLITION SHOWROOM ROOF PLAN 0 4- 8' 16'n <br /> / A3.04 Scale: vs°=r-o° DEMOLITION <br /> SHOWROOM <br /> ROOF PLAN <br /> A3.04 <br />