My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7800 EVERGREEN WAY HYUNDAI 2025-08-22
>
Address Records
>
EVERGREEN WAY
>
7800
>
HYUNDAI
>
7800 EVERGREEN WAY HYUNDAI 2025-08-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2025 8:31:28 AM
Creation date
7/17/2025 11:29:27 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7800
Tenant Name
HYUNDAI
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES-FLOOR PLAN FREIHEIT <br /> 1.PATCH AND REPAIR EXISTING GWB AS REQUIRED AND PREPARE SURFACE TO <br /> ACCEPT NEW FINISH <br /> ARCHITECTURE <br /> 2.REPAIR CONCRETE FLOOR SUBSTRATE AS REQUIRED FOR NEW FINISHES <br /> 3.PATCH AND REPAIR EXISTING RELITE&SIDELITE BLINDS THROUGHOUT <br /> 4.WATER RESISTANT GWB TO BE USED AT ALL WET AREAS <br /> 5.ALL DIMENSIONS ARE FROM FINISH FACE UNLESS NOTED OTHERWISE <br /> 6.PRIOR TO COMPLETION OF CONSTRUCTION,CLEAN ALL SURFACES INCLUDING,BUT <br /> NOT LIMITED TO,WINDOWS,STOREFRONTS,SWITCH&OUTLET PLATES,HVAC GRILLES, <br /> CEILING GRID,RESTROOM FIXTURES&ACCESSORIES.RESTORE ANY OF THE ABOVE TO <br /> LIKE-NEW GOOD WORKING CONDITION AS REQUIRED <br /> 7.ALL MECHANICAL,ELECTRICAL,AND PLUMBING SYSTEMS TO BE BIDDER-DESIGNED. <br /> SUBCONTRACTOR SHALL BE RESPONSIBLE FOR PREPARATION OF DESIGN PLANS, <br /> ENGINEERING,AND PERMITS <br /> KEYNOTES-FLOOR PLAN <br /> FP-01 NEW SHOWROOM ADDITION AND DRIVE-THRU SERVICE DRIVE.SEE SHEET A8.00 FOR <br /> FINISH AND GRAPHICS INFORMATION. <br /> FP-08 SHOWROOM,PARTS AND SERVICE BUILDING EXTERIOR WALLS INDICATED TO REMAIN; J <br /> SEE A4.00 FOR EXTERIOR ELEVATIONS,VERIFY EXTERIOR FINISHES WITH HYUNDAI DID w <br /> PACKAGE. Q <br /> FP-09 NEW INTERIOR WALL CONSTRUCTION. <br /> FP-10 PROVIDE AND INSTALL NEW INTERIOR GLAZING WALLS FOR NEW SALES OFFICES AND O <br /> SERVICE WRITERS AREA. <br /> FP-11 PROVIDE AND INSTALL NEW INTERIOR DOORS AND ASSOCIATE HARDWARE. 73 <br /> FP-12 PROVIDE AND INSTALL NEW FREE-STANDING RECEPTION DESK AND FEATURE WALL,SEE <br /> FURNITURE PLAN FOR ADDITIONAL INFORMATION. uNi <br /> FP-14 HSS COLUMNS PER STRUCTURAL. ry <br /> FP-15 NEW CAR DILEVERY EXTERIOR CANOPY,SEE ELEVATIONS FOR ADDITIONAL INFORMATION. <br /> FP-16 PATCH AND REPAIR AND PAINT ALL INTERIOR WALLS TO REMAIN. W <br /> FP-17 PROVIDE AND INSTALL NEW HIGH SPEED ALUMINUM AND GLASS SECTIONAL OVERHEAD <br /> DOOR. <br /> FP-18 LEAD CAR ZONE DISPLAY FLOORING,SEE FINISH PLAN FOR ADDITIONAL INFORMATION. <br /> FP-19 PROVIDE AFTER HOURS KEY DROP BOX,VERIFY WITH OWNER EXACT SIZE,TYPE,AND Q <br /> FINAL PLACEMENT. <br /> FP-20 PRVIDE TILE OR TROWELLED ON EPDXY FLOORING WITHIN THE NEW SERVICE DRIVCE, 7 <br /> PRVIDE APPROPRATE LANE STRIPING. Q <br /> FP-21 PROVIDE AND INSTALL MEDIA AND REFRESHMENT BAR. <br /> FP-22 PROVIDE AND INSTALL ALL NEW RESTROOM FIXTURES AND FINISHES SEE SHEET A8.00 <br /> FOR FINSIH INFORMATION. 73 <br /> FP-24 PATCH AND REPAIR AND PAINT ALL WALLS AT THE EXISTING PARTS AND SERVICE BAYS. O <br /> FP-25 EXISTING DOORS TO REMAIN BRING TO GOOD CONDITION,AND TO RECEIVE NEW PAINT. <br /> FP-26 INSTALL NEW BAY AND RACK CHARGING EQUIPMENT ASSOCIATED WITH EV SERVICE BAY. O <br /> FP-27 PROVIDE AND INSTALL NEW CONCRETE SEALER THROUGHOUT THE EXISTING SERVICE n/ } <br /> _ BAYS.VERIFY WITH OWNER PHASED FLOOR INSULATION SEE SHEET A8.00 FOR FINISH LL <br /> Owl INFORMATION. <br /> _ FP-29 NEW LOCKER RESTROOM,PROVIDE AND INSTALL ALL NEW RESTROOM FIXTURES AND > S <br /> FINISHES,VERIFY FINISHES WITH OWNER PRIOR TO THE START OF CONSTRUCTION. <br /> FP-31 IN-WALL ROOF DRAINGAGE DOWN SPOUT,TIGHT LINE TO EXTERNAL DRAINGAGE,PER O LLJ 00 <br /> CIVIL. 2 Lu 61 <br /> STORAGE N TECH FP-32 VERTICAL GREEN COLUMNS PER HMA DID PACKAGE. Q <br /> - - - - - - C211 (E)00F410E ( ) CH <br /> �REAKO M FP-33 INSTALL EV VEHICLE CHARGING STATION(LEVEL 3) > <br /> Afi O6 'Ef?'PaEND Ua 'ErMY STORAGE WALLS AND CEILING TO BE FULLY I-HOUR RATED PER IBC <br /> E HALL NO WORK THIS AREA 70 <br /> LLJ <br /> 0 (E)STORAGE m L LI..I w <br /> ,2, - - - - - - - 203 _ _ _ 0 EXISTING CONSTRUCTION CD LLJ <br /> TO REMAIN <br /> Do w <br /> NEW WALL CONSTRUCTION <br /> (E)STORAGE <br /> 21 E)OFFICE (E)OFFICE NEW PARTIAL HEIGHT WALL <br /> 208 207� ® CONSTRUCTION <br /> (E OFFICE (E)OFFICE <br /> O6 205 <br /> 011 WALL TAG-SHEET A3.05 <br /> 100A DOOR TAG-SHEET A9.00 <br /> OWINDOW TAG-SHEET A8.06 <br /> I I I I I I <br /> SHOWROOM BELOW 12733REGISTERED <br /> FARCHITECT <br /> (,—! <br /> HAEL J. LON <br /> TE OF WASHING <br /> ISSUE LIST <br /> 4 - - - - - - - - PERMIT SUBMITTAL 08092022 <br /> PL PRICING UPDATE 09.30.2022 <br /> 1 BLDG REVISION 09.30.2022 <br /> 2 PW REVISION 10.04.2022 <br /> - - - - - - - - - - - - - - - - - - iL <br /> - - 3 PLANNING I PW REVISION 11.23.2022 <br /> I I I I I I I I I I I I <br /> II $ <br /> SHOWROOM 2ND FLOOR PLAN 0 4' 8' 16,� <br /> 1 B <br /> A3.06 Sc.,1/8"=T-0" <br /> SHOWROOM 2ND <br /> FLOOR PLAN <br /> A3.06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.