My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7800 EVERGREEN WAY HYUNDAI 2025-08-22
>
Address Records
>
EVERGREEN WAY
>
7800
>
HYUNDAI
>
7800 EVERGREEN WAY HYUNDAI 2025-08-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2025 8:31:28 AM
Creation date
7/17/2025 11:29:27 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7800
Tenant Name
HYUNDAI
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES-PARTS AND SERVICE BUILDINGS FREIHEIT <br /> 1.LIMITED WORK THROUGHOUT AREA U.O.N. <br /> 2.PATCH,REPAIR,REPAINT,REFINISH WALLS AND FLOORS THROUGHOUT,VERIFY WITH OWNER ARCHITECTURE <br /> EXTENTS OF INTERIOR FINISH WORK. <br /> 3.EXISTING EQUIPMENT TO REMAIN,PROTECT DURRING CONSTRUCTION. <br /> 4.EXISTING LIGHT FIXTURE TO REMAIN,VERIFY WITH OWNER POSSIBLE RE-LAMP WITH LED. <br /> 5.EXISTING MAN AND OVERHEAD DOORS TO REMAIN,BRING TO GOOD WORKING CONDITION,REPLACE <br /> HARDWARE AS REQUIRED. <br /> 6.EXISTING EXTERIOR MATERIALS TO REMAIN,PAINT ALL BLUE METAL ROOFS,FLASHING,AND SIDING <br /> SEE EXTERIOR FINISH SCHEDULE FOR ADDITIONAL INFORMATION. <br /> 7.SEE A3.04 FOR KEYNOTE INFORMATION. <br /> KEYNOTES-FLOOR PLAN <br /> FP-01 NEW SHOWROOM ADDITION AND DRIVE-THRU SERVICE DRIVE.SEE SHEET A8.00 FOR <br /> FINISH AND GRAPHICS INFORMATION. <br /> FP-08 SHOWROOM,PARTS AND SERVICE BUILDING EXTERIOR WALLS INDICATED TO REMAIN; <br /> SEE A4.00 FOR EXTERIOR ELEVATIONS,VERIFY EXTERIOR FINISHES WITH HYUNDAI DID <br /> PACKAGE. <br /> FP-09 NEW INTERIOR WALL CONSTRUCTION. <br /> FP-10 PROVIDE AND INSTALL NEW INTERIOR GLAZING WALLS FOR NEW SALES OFFICES AND <br /> SERVICE WRITERS AREA. <br /> FP-11 PROVIDE AND INSTALL NEW INTERIOR DOORS AND ASSOCIATE HARDWARE. <br /> FP-12 PROVIDE AND INSTALL NEW FREE-STANDING RECEPTION DESK AND FEATURE WALL,SEE <br /> FURNITURE PLAN FOR ADDITIONAL INFORMATION. J <br /> FP-14 HSS COLUMNS PER STRUCTURAL. w <br /> FP-15 NEW CAR DILEVERY EXTERIOR CANOPY,SEE ELEVATIONS FOR ADDITIONAL INFORMATION. Q <br /> FP-16 PATCH AND REPAIR AND PAINT ALL INTERIOR WALLS TO REMAIN. <br /> FP-17 PROVIDE AND INSTALL NEW HIGH SPEED ALUMINUM AND GLASS SECTIONAL OVERHEAD O <br /> DOOR. G <br /> FP-18 LEAD CAR ZONE DISPLAY FLOORING,SEE FINISH PLAN FOR ADDITIONAL INFORMATION. <br /> FP-19 PROVIDE AFTER HOURS KEY DROP BOX,VERIFY WITH OWNER EXACT SIZE,TYPE,AND W <br /> FINAL PLACEMENT. <br /> FP-20 PRVIDE TILE OR TROWELLED ON EPDXY FLOORING WITHIN THE NEW SERVICE DRIVCE, <br /> PRVIDE APPROPRATE LANE STRIPING. <br /> FP-21 PROVIDE AND INSTALL MEDIA AND REFRESHMENT BAR. ui <br /> FP-22 PROVIDE AND INSTALL ALL NEW RESTROOM FIXTURES AND FINISHES SEE SHEET A8.00 <br /> FOR FINSIH INFORMATION. <br /> FP-24 PATCH AND REPAIR AND PAINT ALL WALLS AT THE EXISTING PARTS AND SERVICE BAYS. <br /> FP-25 EXISTING DOORS TO REMAIN BRING TO GOOD CONDITION,AND TO RECEIVE NEW PAINT. <br /> FP-26 INSTALL NEW BAY AND RACK CHARGING EQUIPMENT ASSOCIATED WITH EV SERVICE BAY. Q <br /> FP-27 PROVIDE AND INSTALL NEW CONCRETE SEALER THROUGHOUT THE EXISTING SERVICE z <br /> BAYS.VERIFY WITH OWNER PHASED FLOOR INSULATION SEE SHEET A8.00 FOR FINISH <br /> INFORMATION. Q <br /> FP-29 NEW LOCKER RESTROOM,PROVIDE AND INSTALL ALL NEW RESTROOM FIXTURES AND <br /> FINISHES,VERIFY FINISHES WITH OWNER PRIOR TO THE START OF CONSTRUCTION. <br /> FP-31 IN-WALL ROOF DRAINGAGE DOWN SPOUT,TIGHT LINE TO EXTERNAL DRAINGAGE,PER O <br /> CIVIL. <br /> FP-32 VERTICAL GREEN COLUMNS PER HMA DID PACKAGE. O <br /> FP-33 INSTALL EV VEHICLE CHARGING STATION(LEVEL 3) 0 } <br /> FP-34 UPGRADE BATTERY STORAGE WALLS AND CEILING TO BE FULLY 1-HOUR RATED PER IBC <br /> TABLE 509 > a O <br /> LEGEND-FLOOR PLAN 0 Z N <br /> Lu!=^ LLJ rn <br /> NO WORK THIS AREA vJ ry Q <br /> 0 EXISTING CONSTRUCTION Q i <br /> TO REMAIN 0 Lu <br /> iiiiiiiiiiiiiiiiim NEW WALL CONSTRUCTION Z LU LIJ <br /> CDry <br /> CD W <br /> ® NEW PARTIAL HEIGHT WALL 00 <br /> CONSTRUCTION = r LIJ <br /> 011 WALL TAG-SHEET A3.05 <br /> 100A DOOR TAG-SHEET A9.00 <br /> OWINDOW TAG-SHEET A8.06 <br /> FP-25 <br /> TW <br /> 12733 <br /> � � � REGISTERED <br /> ® ARCHITECT <br /> (E)LOCKEf� f f f <br /> F, t. <br /> FP-27 TYP (E)RR T� FP27 MICHAEL J. L TON <br /> TYP (E)SOUTH 7137�SERVICE TYp (S)RVICE STATE OF WASHINGTON <br /> ANNEX SERVICE FP-24 (E)ELEC <br /> < > < 1 ANNEX Typ 1401 <br /> E134� ex 7'jj8(E)COMPRESSOR, " �expNExiWHEEL BALANCER, ISSUE LIST <br /> TIRE CHANGER gPERMIT SUBMITTAL 03.31.2022 <br /> PRICING UPDATE 08.09.2022 <br /> 39p1BLDG REVISION 10.04.2022 <br /> 2 PW REVISION 10.04.2022 <br /> 3 PLANNING I PW REVISION 11.23.2022 <br /> (E L J ® SPECIAL (E)FLUIDS/ <br /> STORAGE, <br /> L-1 <br /> E13671 139 <br /> �❑ <br /> g <br /> SOUTH SERVICE ANNEX FLOOR PLAN 0 4' 6' 16' <br /> CT:) <br /> 1 SOUTH SERVICE <br /> N <br /> Scale:1/8„=V-0° <br /> ANNEX FLOOR <br /> PLAN <br /> A3.08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.