Laserfiche WebLink
GENERAL NOTES-FINISH PLAN FREIHEIT <br /> 1.PATCH&REPAIR ALL FLOORS,WALLS,AND CEILINGS AS REQUIRED BY DEMOLITION <br /> AND NEW CONSTRUCTION.ALL SURFACES ARE TO BE UNIFORM AND IN"LIKE-NEW" ARCHITECTURE <br /> CONDITION. <br /> 2.PATCH AND REPAIR FLOORING FINISHES,PAINTED SURFACES,AND BASE AS IS <br /> REQUIRED BY CONSTRUCTION TO MATCH EXISTING ADJACENT FINISHES.PROVIDE <br /> OWNER WITH SAMPLE FOR APPROVAL PRIOR TO INSTALLING ALL FINISHES. <br /> 3.SUBMIT FINISH SAMPLES TO OWNER FOR APPROVAL PRIOR TO ORDERING MATERIAL. <br /> 4.ANY ITEMS OR SURFACES WHICH ARE UNSPECIFIED AS TO MATERIAL AND/OR COLOR <br /> ARE TO BE BROUGHT TO THE DESIGNERS ATTENTION FOR SPECIFICATION <br /> 5.HEIGHT DIFFERENCES BETWEEN FLOORING MATERIALS SHALL BEVEL AT A RATIO OF <br /> 1.2 IF GREATER THAN 1/4"PER ADA ACCESSIBILITY CODES. <br /> 6.USE RUBBER REDUCER STRIP AT ALL DISSIMILAR FLOORING TRANSITIONS TO MATCH <br /> SPECIFIED RUBBER BASE(UNO). <br /> 7.GENERAL WALL FINISH TO BE SMOOTH,LEVEL 4,PLUS FIRST COAT(PRIME COAT); <br /> AREAS WITH HIGH SUN EXPOSURE TO BE LEVEL 5. <br /> 8.ALL PAINTED AREAS TO RECEIVE ONE(1)COAT TINTED LATEX WALL PRIMER AND TWO <br /> (2)COATS PAINT WITH FINAL COAT APPLIED AFTER GENERAL TOUCHUP IS COMPLETED. <br /> USE 112"TO 3/8"NAP ROLLER. <br /> 9.ALL PAINT TO BE LOW VOC. J <br /> 10.PAINT FINISHES: LLI <br /> GENERAL CONDITIONS:EGGSHELL 0 <br /> SOFFITS/CEILINGS:FLAT FINISH O <br /> WETAREAS:SEMI-GLOSS 0 <br /> PAINT GRADE DOORS&TRIM:SEMI-GLOSS LATEX ENAMEL <br /> 11.ALL SERVICE EQUIPEMTN TO BE BLACK,EXISTING LIFTS TO BE PAINTED BLACK TO WN <br /> MATCH NEW WORKBENCHES. ry <br /> W <br /> LEGEND-FINISH PLAN <br /> WALL FINISH; ROOM NAME v J <br /> ROOM NUMBER <br /> e"• SEE FINISH SCHEDULE 100 WALL FINISH Q <br /> WALL BASE <br /> FLOOR FINISH Z <br /> FLOOR FINISH; <br /> n -XX <br /> SEE FINISH SCHEDULE Q <br /> CARPET CC <br /> a PATTERN DIRECTION G <br /> " VINYL PLANK O <br /> S ' FLOORING TRANSITION O <br /> y SHEETVINYL } <br /> NO WORK THIS AREA FIELD TILE O <br /> ® ® a TO Z N <br /> Lu SEALED CONCRETE ^ w Q <br /> ° (E)PARTS " <br /> Q <br /> STORAGE 0 w <br /> ;s41 P-a z L j L.LI <br /> Lu <br /> + OD <br /> L1 <br /> F <br /> 12733 <br /> REGISTERED <br /> El <br /> -u+°s' envan. eay'xae °'^ ARCHITECT <br /> a (E)NORTH " T � <br /> ° SERVICE • (E SERVICE ° 14 <br /> ° MICHAEL . L TON <br /> ANNEX 1 1. <br /> 1 <br /> 3 <br /> 133 ° P�av-s " ^ q STATE OF WASHINGTDN <br /> SG1 3 i � <br /> •�� / /� < <br /> ISSUE LIST <br /> PERMIT SUBMITTAL 03.31.2022 <br /> PRICING UPDATE 08.09.2022 <br /> 4 1 BLDG REVISION 09.30.2022 <br /> 2 PW REVISION 1 . .2022 <br /> 3 PLANNING I PW REVISION 11.2323.2022 <br /> ° ry ° ", •, a TIER 3 DOUBLE WORK BENCH GLOSS BLACK <br /> FINISH WI STAINLESS STEEL TOPS,BY SHURE ^ <br /> MANUFACTURING,SEE SERVICE AREA WORK <br /> BENCH SCHEDULE FOR ADDITIONAL' °q <br /> 9 INFORMATION. <br /> a " <br /> PARTS AND SERVICE FINISH PLAN o a' <br /> � D <br /> PARTS AND <br /> Scale:1/8"=T-0" <br /> SERVICE FINISH <br /> PLAN <br /> A8.01 <br />