My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7800 EVERGREEN WAY HYUNDAI 2025-08-22
>
Address Records
>
EVERGREEN WAY
>
7800
>
HYUNDAI
>
7800 EVERGREEN WAY HYUNDAI 2025-08-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2025 8:31:28 AM
Creation date
7/17/2025 11:29:27 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7800
Tenant Name
HYUNDAI
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOENGINEERS� <br /> 17425 NE Union Hill Road Suite 250 <br /> Redmond, Washington 98052 <br /> 425.861.6000 <br /> December 7, 2023 <br /> LMJ Enterprises, LP <br /> 11845 NE 85t"Street <br /> Kirkland, Washington 98033 <br /> Attention:Tod Johnson <br /> Subject: Summary of Geotechnical Construction Observation Services <br /> Lee Johnson Hyundai Dealership <br /> 7800 Evergreen Way <br /> Everett, Washington <br /> File No. 24459-003-00 <br /> This letter presents a summary of our geotechnical construction observation services completed for the <br /> Lee Johnson Hyundai Dealership project at 7800 Evergreen Way in Everrett, Washington. Our services for <br /> this project were completed in general accordance with our agreement dated February 2, 2023. <br /> Geotechnical recommendations for the site were provided in our report titled "Geotechnical Engineering <br /> Services- Lee Johnson Lee Johnson Dealership Improvements, 7800 Evergreen Way, Everett,Washington" <br /> dated December 6, 2021,as well as addendum letters 1 and 2 dated March 31, 2022, and May 24, 2023, <br /> respectively. <br /> EARTHWORK OBSERVATION <br /> We provided geotechnical construction observation services for the project during 43 site visits between <br /> March 22, 2022, and November 15, 2023. Observations and test results documenting our construction <br /> services are presented in our daily field reports, numbered 1 through 43. <br /> Our construction observation services for the LMJ Totem Lake project included the following activities: <br /> ■ Backfill placement and compaction <br /> ■ Subgrade evaluation <br /> ■ Foundation drainage evaluation <br /> Backfill Placement and Compaction <br /> We observed placement and compaction of structural fill to raise site grades, to backfill against footings, <br /> to backfill around the R-tank, and to backfill utility trenches. Prior to raising site grades, we evaluated <br />
The URL can be used to link to this page
Your browser does not support the video tag.