Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> PERMIT EXTENSION SHARON EXTENSION <br /> 6/3/2024 6/3/2024 (REASON GILFEATHER APPROVED <br /> REQUIRED) <br /> Notes: <br /> WORK ON GOING <br /> PW 18-CURB OR PARTIAL <br /> 6/24/2024 6/24/2024 SIDEWALK JIM KNAPPERT APPROVAL <br /> SUBGRADE <br /> Notes: <br /> Discuss how much concrete to remove. <br /> PW 25-SITE CORRECTION <br /> 7/25/2024 7/25/2024 FINAL/PERMIT JIM KNAPPERT REQUIRED <br /> CLOSE OUT <br /> Notes: <br /> Alex Olson 425-879-9512 <br /> Need asbuilts,bonds,easements. <br /> 8/7/2024 8/7/2024 PLANNING ALEX BYRD CORRECTION <br /> LANDSCAPING REQUIRED <br /> Notes: <br /> SW corner in front of new building needs to be filled in with shrubs and ground cover per approved landscaping plan. <br /> 8/15/2024 8/15/2024 PLANNING ALEX BYRD F LANDSCAPING APPROVAL <br /> Notes: <br /> 8/19/2024 8/19/2024 NPDES FINAL JIM KNAPPERT CORRECTION <br /> INSPECTION REQUIRED <br /> Notes: <br /> Need warranty bonds. <br /> 8/20/2024 8/20/2024 PW ASBUILTS JIM KNAPPERT APPROVAL <br /> SUBMITTED <br /> Notes: <br /> NPDES FINAL APPRVD-PERMIT <br /> 8/26/2024 8/26/2024 INSPECTION JIM KNAPPERT FINAL <br /> FOLLOW-UP <br /> Notes: <br /> 8/27/2024 8/27/2024 PW 1YR PUBLIC IMP THAD NEWPORT RECEIVED <br /> WARRANTY <br /> Notes: <br /> 8/27/2024 8/27/2024 PW 2YR DRAINAGE THAD NEWPORT RECEIVED <br /> IMP WARRANTY <br /> Notes: <br /> I <br /> Printed:Thursday,29 August,2024 4 of 4 <br /> SUPERION <br />