My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3620 W MUKILTEO BLVD C 2023 HARBORS EDGE TOWNHOMES Plans 2025-07-22
>
Address Records
>
W MUKILTEO BLVD
>
3620
>
HARBORS EDGE TOWNHOMES
>
Plans
>
3620 W MUKILTEO BLVD C 2023 HARBORS EDGE TOWNHOMES Plans 2025-07-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 9:08:16 AM
Creation date
7/18/2025 7:34:18 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
3620
Unit
C
Tenant Name
HARBORS EDGE TOWNHOMES
Permit
B2304-040
Year
2023
Notes
NEW "HARBOR'S EDGE" TOWNHOMES, UNIT C
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I—a U <br /> zl s <br /> UNIT 17 UNIT 16 UNIT 15 2 UNIT 14I cxi� p~ <br /> Y^ Yz' Q � <br /> r�Y{ r-sY" r-6Y2^ 1`6V rs^ ,'-s^ r-6Y{ I 1`6V Z <br /> 8 <br /> 41S06 3 4/SO6 P2-2 4/SO6 <br /> P2-2 6 S07 s PER s <br /> PER 4Sim B ■ T <br /> PER _SIM— L 1 L <br /> —— ——————— ———....... <br /> —————— ————— <br /> , y ENGINEERING P.S. <br /> 1° SW T SW EXTEND CONIC. " <br /> WALL THRU <br /> DEMISING SPACE° T <br /> I 4° <br /> 7 SIM <br /> HOLD DOWN SCHEDULE <br /> °8"WALL <br /> a SIMPSON DETAIL <br /> P ° PLAN SIMPSON ANCHOR _ <br /> We <br /> mr m , HOEDOWN REFERENCE/ <br /> �a ° al da CALLOUT TYPE BOLT TYP NOTES <br /> a cslsxas'• <br /> ^ 1 — 14/SO6 U.O.N. <br /> 4IS06 '. <br /> O <br /> STRAP <br /> d <br /> IAA <br /> It! <br /> 6 SLAB-ON-GRADE' ° I. a a•SL <br /> a/sos a/sos a/sos a/sos a/sos (z>cslsxas' <br /> P2 2 3 P2-2 3 P2-2 3 P2 2 PER PLAN NOTE 1 4 PE `� STRAPS — 14/SO6 U.O.N. <br /> g S07 6 PER s S07 6 PER 6 S07 (ELEV.VARIES) S07 <br /> PER 4/SOB, 4/SOB, PER " a <br /> a/sos a/sos ( 1a/sos U.O.N. <br /> ---------- —SIM ° ... S16xx48" _ <br /> — --------- ---------- —SIM— • , <br /> 3)C <br /> ----.W EN- '-- --_ — --- — --- -- — -- ° " O NOT USED <br /> STRA <br /> SW " ` - , SW :• ., EXTEND CONIC " SW "EXTEND CONIC SW = ° ° <br /> I • _ " < " " WALLTHRU ° WALLTHRU ° �' VERTICAL _ Z <br /> < { 6 BEAM TO POST <br /> DEMISING SPACE DEMISING SPACE " <br /> - HTS30 <br /> • , <br /> ' a /" 5'SY"e 5 <br /> STHD74 — 17/507 U.O.N. <br /> a <br /> • • <br /> Q a s 6• O ~ <br /> ,I w °• < , a " B.WALL 7 HDUBSDS S / 24 18S07 U.O.N.8"WALL 8"WALL <br /> Q <br /> so7 • <br /> " SLAB-ON-GRADE _ " ° SLAB-ON-GRADE ° SLAB-ON-GRADE = 1 ,• a LL <br /> ' < PER PLAN NOTE 1 _ PER PLAN NOTE 1 • PER PLAN NOTE 1 - °4 4•• <br /> —— <br /> (ELEV.VARIES) ° S07 <° (ELEV.VARIES) pa' a.S07 e. (ELEV.VARIES) e <br /> r <br /> 1 I <br /> N <br /> S07 <br /> • s - , ° •- SLAB-ON-GRADE SLAB-ON-GR <br /> a ° PER PLAN NOTE 1 PER PLAN W <br /> 14 <br /> I a ° <br /> •S07 1 <br /> a <br /> 15�_5„ 3'-10%z" 3-10Yz" 15'-5%2^ - . 15'-SYz" a 3'-10%i' _ as 1. a °• ,1 <br /> s s 6 6 'I , <s, 6 4'-OY4. • 4,-zyz, 11'-1Y," 1Y-1Yi'— <br /> P1-6 P1-6 _. - P1-6Zi <br /> I I <br /> I o 13 � I 1 al 13• � � ° Via' o 13 I `I, _ s I I 'd I,• O 3 <br /> S07 O L <br /> I I so7 I I� I I ° .I I• � <br /> ._ <br /> , I — `o <br /> t— _ <br /> Z <br /> 1 <br /> a N <br /> N <br /> I I I — — — — ——— — O E <br /> 14 14 14 <br /> 507 IM <br /> °Pi-2 <br /> 7 7 7 <br /> I S <br /> o <br /> e so so so <br /> a1 <br /> LAB- N-•RADE LAB- N- RADE " i 1 LAB- N- RADE 7 7 2 S O G S O G S O G 7 <br /> I <br /> 1 d^ . s <br /> l a`) <br /> p° PER PLAN NOTE 1 PER PLAN NOTE 1 ` { PER PLAN NOTE 1 • 0) <br /> TO TO TO <br /> vt <br /> 1 <br /> S07 1 01 <br /> LL <br /> _ 6 .r —� °r—• POST POST POST � FOUNDATION PLAN NOTES: r'� LLI td <br /> S07 `y 1. Slab-on-grade shall be 4'th ck u o n Slab shall be poured over vapor bamer placed over free-draining granular fill per _0 W <br /> e a, Geotechnl al Report.One or more of the following should be considered but are not required)to control slab cracking w <br /> ° S07 S07 607„ Fibrous atlm zture <br /> • °" •I ' r 6x6 W14xW1.4 WWM at center (n <br /> ta' I• <br /> Contro orris <br /> 40 °4'0 4'- 11'-1 11'-1 •4- 4'-0 Ya'" Y4 2Yz" Y4 Y4 � Ya � m <br /> m <br /> z, <br /> See Architectural Drawings for slab depression and slope requirements. <br /> — — <br /> < — <br /> i <br /> ° <br /> • ..,. & r °8 a � 2. Provide Construction/Control Joint in Slab per Architectural Drawings.Areas shall be approximately square and 400 star less. ��..rr-.�� <br /> lV <br /> ° f— r a I r —LZ <br /> 3. Bottom of Footings shall beset on wmpetenl,propedy compacted Bearing Soil below Frost Depth. TT <br /> 1 <br /> I _ <br /> 5. Anchor Bolls for Extedor Stud Walls shall be In accordance with P1 6 of the Shear Wall Schedule of 1/S06 u.o.n. <br /> I I -I <br /> ar ° i I <br /> so7----- — L — — -- — — LI <br /> --- — -- --- -- — — -- -- — �✓y�SAGE.HOMES <br /> LEGEND�P1 2< <br /> P7-2 <br /> Y� <br /> Z �TO SO] TO To SO] TO TO SO] TO j / Sage Homes Northwest <br /> POST POST POST POST POST POST SX.X DETAIL CALL-OUT <br /> Q 9505 191h Ave SE <br /> ANCHOR BOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF 1/SO6 Suite A 9 <br /> Everett,WA 98208 <br /> 11'-4%z' T-11" 7'-1 1" 11'-5" 11'-5" T-11" T-11" 1 V-5" 11'-5"— www.sagehomesnw.com <br /> SLAB-ON-GRADE PER PLAN NOTE 1 <br /> r � <br /> FOUNDATION WALL AND FOOTING JOB NO.: <br /> L----J <br /> 22-447-02 <br /> 0 BEARING OR SHEAR WALL ABOVE <br /> PLOT DATE <br /> OFOOTING CALL-OUT SEE 2/S07 08/29/2022 <br /> SW STEP STEM WALL DATE: 08/29/2022 <br /> SCALE: Y4"=V-0" <br /> : <br /> / HOLD-DOWN TO WALL ABOVE PER SCHEDULE ON PLAN DRAWN BIDS <br /> CHCKD: RMH <br /> SHEET NO.: <br /> 0 1 a 4 8 16 S02a <br />
The URL can be used to link to this page
Your browser does not support the video tag.