My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 E MARINE VIEW DR 2025-08-19
>
Address Records
>
E MARINE VIEW DR
>
1001
>
1001 E MARINE VIEW DR 2025-08-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 3:45:52 PM
Creation date
7/18/2025 9:27:54 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
1001
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2311-071 Description: RE-ROOF SENIOR APARTMENT COMPLEX,CONNECTED <br /> STRUCTURE <br /> Applied: 11/30/2023 Approved: 12/16/2023 Site Address: 1001 E MARINE VIEW DR <br /> Issued: 12/20/2023 Finaled: City,State Zip Code: EVERETT,WA 98201 <br /> Status: PERMIT ISSUED Applicant:TACOMA ROOFING&WATERPROOFING <br /> Parent Permit: Owner:VINTAGE AT EVERETT LP <br /> Parent Project: Contractor:TACOMA ROOFING&WATERPROOFING <br /> Details: <br /> DEMO EXISTING ROOF DOWN TO SUBSTATE, REPLACE W/LIKE MATERIALS. INSTALLING IKO CAMBRIDGE SHINGLES ON STEEP SLOPE <br /> ROOFS AND VERSICO 60 MIL TPO MEMBRANE ON LOW SLOPE ROOFS. <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 2/22/2024 BFD INSPECTION Unassigned eTRAKiT Inspection Request <br /> NOTES <br /> Notes: <br /> 2/20/2024 7:53 AM TACOMA ROOFING&WATERPROOFING <br /> Good Moring.We are starting the roof demo process on Thursday morning 2/22/2024(possibly on Wednesday the 21st if the weather allows)and will <br /> need to install the new shingles on the section we tear off to keep the building dried in and secured from weather. My question is do you need to sign <br /> off on the tear off before we install the new shingles.This process will repeat throughout the duration of the project. If you need to sign off on the Tear <br /> off,can you please schedule this on Thursday 2-22-2024. Please feel free to reach me at the office(253)472-3484 or on my personal cell phone(360) <br /> 440-0369. <br /> Thank you. I appreciate your time! <br /> Mike Docken <br /> Contact Name:TACOMA ROOFING&WATERPROOFING <br /> Site Address:1001 E MARINE VIEW DR <br /> Phone:2534723484 <br /> e-Mail:mike@tacomaroofco.com <br /> PERMIT EXTENSION SHARON EXTENSION <br /> 6/10/2024 6/10/2024 (REASON GILFEATHER APPROVED eTRAKiT Inspection Request <br /> REQUIRED) <br /> Notes: <br /> 6/7/2024 1:30 PM TACOMA ROOFING&WATERPROOFING <br /> Hello.I need to file for a permit extension request on this project.Our scope of work is pending on another trades scope of work to install solar panels <br /> on the roof.The general contractor told me they cannot move forward with the solar panel work until they have a permit. Please let me know if you <br /> have any questions.Thank you. <br /> Mike Docken <br /> (253)472-3484 <br /> Contact Name:TACOMA ROOFING&WATERPROOFING <br /> Site Address:1001 E MARINE VIEW DR <br /> Phone:2534723484 <br /> e-Mail:mike@tacomaroofco.com <br /> I <br /> Printed:Thursday,23 January, 2025 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.