Laserfiche WebLink
110.9 Interrupting Rating. <br /> "Equipment intended to interrupt current at fault levels shall have an interrupting rating <br /> sufficient for the nominal circuit voltage and the current that is available at the line <br /> terminals to the equipment." <br /> "Equipment intended to interrupt current at other than fault levels shall have an <br /> interrupting rating at nominal circuit voltage sufficient for the current that must be <br /> interrupted." <br /> 110.16 Flash Protection. <br /> "Switchboards, panelboards, industrial control panels, meter socket enclosures, and <br /> motor control centers that are in other than dwelling occupancies and are likely to require <br /> examination, adjustment, servicing, or maintenance while energized shall be field marked <br /> to warn qualified persons of potential electric arc flash hazards. The marking shall be <br /> located so as to be clearly visible to qualified persons before examination, adjustment, <br /> servicing, or maintenance of the equipment." <br /> eti Conformity Services would be happy to provide a proposal for above <br /> services upon receiving a request from the customer. <br /> 6.6 Internal Wiring <br /> Internal wiring and wiring methods are evaluated for compliance with the <br /> applicable codes and standards referenced in Section 4.0. Wiring is <br /> verified to be properly sized and rated, with a temperature rating suitable <br /> for the installed application. <br /> 6.7 Safety Interlocks and Operator Controls <br /> The equipment safety interlocks, emergency stops, operator controls and <br /> human machine interfaces (HMI) are verified to be properly identified. The <br /> safety features and emergency machine off (EMO) switches are tested for <br /> proper operation. <br /> 6.8 Field Testing <br /> Field testing is performed on the equipment, to meet the field testing <br /> requirements of the standards referenced in Section 4.0, unless <br /> production test results have been provided by the equipment manufacturer <br /> and accepted by eti Conformity Services. If no production tests are <br /> submitted, then testing is performed to verify the equipment to be <br /> operating within normally expected parameters as detailed in Section 8.0. <br /> Reference No.: 1108546 Page 5 <br />