Proposed Remedial Excavation: 4849 Spire Lane,Everett,WA <br /> December 8,2022 <br /> .Variations in soil conditions may exist between what was anticipated and the actual <br /> conditions underlying the site. The nature and extent of soil variations may not be evident <br /> until construction occurs. If any soil conditions are encountered at the site that are different <br /> from those described in this report, we should be notified immediately to review the <br /> applicability of our recommendations. Additionally,we should also be notified to review <br /> the applicability of our recommendations if there are any changes in the project scope. <br /> The scope of our work does not include services related to construction safety precautions. <br /> Our recommendations are not intended to direct the contractors' methods, techniques, <br /> sequences or procedures,except as specifically described in our report for consideration in <br /> design. Additionally, the scope of our work specifically excludes the assessment of <br /> environmental characteristics, particularly those involving hazardous substances. We are <br /> not mold consultants nor are our recommendations to be interpreted as being preventative <br /> of mold development. A mold specialist should be consulted for all mold-related issues. <br /> This report has been prepared for planning and design purposes for specific application to <br /> the proposed project in accordance with`-the generally accepted standards of local practice <br /> at the time this report was written. No warranty, express or implied, is made. <br /> This report may be used only by the client and for the purposes stated,within a reasonable <br /> time from its issuance. Land use, site conditions (both off and on-site), or other factors <br /> including advances in our understanding of applied science, may change over time and <br /> could materially affect our findings. Therefore, this report should not be relied upon after <br /> 24 months from its issuance. PanGEO should be notified if the project is delayed by more <br /> than 24 months from the date of this report so that we may review the applicability of our <br /> conclusions considering the time lapse. <br /> It is the client's responsibility to see that all parties to this project, including the designer, <br /> contractor, subcontractors, etc., are made aware of this report in its entirety. The use of <br /> information contained in this report for bidding purposes should be done at the contractor's <br /> option and risk. Any party other than the client who wishes to use this report shall notify <br /> PanGEO of such intended use and for permission to copy this report. Based on the intended <br /> use of the report, PanGEO may require that additional work be performed and that an <br /> updated report be reissued. Noncompliance with any of these requirements will release <br /> PanGEO from any Iiability resulting from the use this report. <br /> 22-389_4849 spire lane everett tpt.docx Page I I PanGEO, Inc. <br />