My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1009 COLBY AVE 2025-08-21
>
Address Records
>
COLBY AVE
>
1009
>
1009 COLBY AVE 2025-08-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 10:53:42 AM
Creation date
7/21/2025 9:21:12 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1009
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2407-051 Description: New Kitchen and Bathroom on the Main Floor <br /> Applied:7/19/2024 Approved: 10/1/2024 Site Address: 1009 COLBY AVE <br /> Issued: 10/1/2024 Finaled: City,State Zip Code: EVERETT,WA 98201-1521 <br /> Status: PERMIT ISSUED-ONLINE Applicant: RICHMOND CONSTRUCTION LLC <br /> Parent Permit: Owner: Mikki Clow <br /> Parent Project: Contractor: RICHMOND CONSTRUCTION LLC <br /> Details: <br /> We will be removing the kitchen and bathroom wall board down to bare studs then having electricians re-wire the Nob and tube and <br /> move outlets and lighting to new locations as well in the bathroom.we will be makeing the Bathroom bigger to accommodate for <br /> more space but not adding Square footage to the home.Then we will be installing tile flooring throughout the kitchen and bathroom <br /> with new Drywall. <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 10/14/2024 10/14/2024 BLDG 08-FRAMING RAKEEB KHAN NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 10/11/2024 8:52 AM RICHMOND CONSTRUCTION LLC <br /> Framing,Plumbing,Mechanical Inspection needed for cover <br /> Contact Name:RICHMOND CONSTRUCTION LLC <br /> Site Address:1009 COLBY AVE <br /> Phone:2067886422 <br /> e-Mail:jacob@ RICH MONDCON.COM <br /> Missing framing in floor.See structural plans and details. Missing post at fireplace.Overdrilled and notched ceilingjoists.Need all sub permit rough in <br /> approval prior to framing inspection. Fireblock all top and bottom plate penetrations. <br /> 10/24/2024 10/24/2024 BLDG 08-FRAMING RAKEEB KHAN PARTIAL eTRAKiT Inspection Request <br /> APPROVAL <br /> Notes: <br /> 10/22/2024 11:15 AM RICHMOND CONSTRUCTION LLC <br /> Contact Name:RICHMOND CONSTRUCTION LLC <br /> Site Address:1009 COLBY AVE <br /> Phone:2067886422 <br /> e-Mail:MELISSA@RICHMONDCON.COM <br /> Exterior walls ok to insulate.Waiting on engineer letter regarding floor framing repair in bathroom. Do not cover mechanical work. <br /> I <br /> Printed:Tuesday,28 January,2025 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.