My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1009 COLBY AVE 2025-08-21
>
Address Records
>
COLBY AVE
>
1009
>
1009 COLBY AVE 2025-08-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 10:53:42 AM
Creation date
7/21/2025 9:21:12 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1009
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phone Hours: M—F: 8:30 a.m.— 12 p.m. & 1 p.m.—3 p.m. <br /> everettwa.gov/permits I onlinepermits.everettwa.gov I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure <br /> pursuant to the Public Records Act. <br /> Category 2: For official use only/disclosure permissible by law. <br /> From: kody gummere<kgum mere 1987@gmail.com> <br /> Sent:Thursday,July 25, 2024 2:02 PM <br /> To: Permit Services<PermitServices@everettwa.gov> <br /> Subject: Re: [EXTERNAL] Processing P2406-068 <br /> I'm not sure I understand your question.There are 2 water closets that will be pulled, repiped and <br /> replaced. 2 bathroom lays that will be pulled, repiped and replaced. 1 kitchen sink that will be pulled & <br /> replaced and 1 laundry sink that will be repiped.The Autowash is currently plumbed incorrectly,with <br /> no p-trap. So I will be repiping it from the main stack to include a p-trap. <br /> On Thu,Jul 25, 2024, 11:51 Permit Services<PermitServices@everettwa.gov>wrote: <br /> Category 2:Sensitive information <br /> Hi Kody, <br /> Thanks for getting back to me so quickly. On our plumbing permits, we are fixture-based, so I need to <br /> know the specific amount of toilets and bathroom sinks being installed/replaced under this <br /> application.To move forward, can you specify the fixtures being installed in the water closets and <br /> lays?Also, can you tell me more about the autowash?That may or may not need to be included on <br /> the permit but I need more specific information to move forward. <br /> ` Thanks so much, <br />
The URL can be used to link to this page
Your browser does not support the video tag.