Laserfiche WebLink
Intake & Approval Sheet 'pp (FOR PERMIT STAFF ONLY) PERMIT# � �- <br /> BUILDING PLANNING <br /> Intake OK by: Date: Intake OK by: Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> Zone <br /> ❑ Make this a"W"Permit ❑ SRC Required(Pre-Insp) Overlay/Agreement <br /> Bldg/TI/Addn/Rem Size Nonresidential Use <br /> Garage/Accessory Struct.Size Residential Use <br /> Number of Stories Proposed No.of Dwelling Units: <br /> Basement []No ❑Yes , Fin/Unfin Total No.of Dwelling Units: <br /> Type of Construction Planning/Landscape Inspection Required before Final? ❑Yes []No <br /> Occupancy Group "In Lieu"Fee:Type: Amount$ <br /> Occupancy Load School Impact Fee: Total $ <br /> Cert. of Occpuancy Required? []No ❑Yes ❑Shell Only Calculated: Credit: <br /> Code Year 02021 ❑2018 112015 ❑Everett School Dist ❑Mukilteo School Dist <br /> Fire Sprinklers: []Update Existing El New System El Not Req'd Park Impact Fees for permits applied for after 1/1/2022: <br /> Reason Sprinklers Required: Park Impact Fee Total$ (net due after credit for existing uses) <br /> Fire Alarm: ❑Update Existing ❑New System []Not Req'd Fee Schedule Used For Calculation(Year): <br /> Reason Fire Alarm Required: <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes ❑ No <br /> Add'I RCW 64.55 does required prior to final? ❑Yes El No Additional Notes: <br /> VALUATION CALCULATION: Total$ <br /> Approved By: Date: <br /> PUBLIC WORKS <br /> Intake OK by: Date: <br /> Intake Comments: PW Review&Worksheet Needed If., <br /> ❑Sys Dev Eval: <br /> Additional Notes: ❑Water []Sewer ❑Storm <br /> []Traffic Mitigation Eval <br /> Approved Date: L 120 Wit' []Site Work/Drainage(shown/triggered) <br /> ❑Address Letter <br /> FIRE DEPARTMENT ❑Backflow Prevention for high hazard: <br /> Separate/Deferred Submittals Required: (dental,medical,animals,mortuary, <br /> El Fire Sprinklers ❑Fire Alarm ❑Other: hospital,supportive housing) <br /> Additional Notes: ❑ This Permit is Approved by Public Works <br /> ❑ See PW Review Worksheet and associated attached items <br /> Fire Dept. Fees: ❑ A Separate PW Permit is Required (Permit#: PW ) <br /> ❑ Review of As-Built Plans-NO FIRE FEE AND ❑ Is fully digital <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE ❑ Is located in this folder <br /> ❑ Review/Inspection Scope-ADD FIRE FEE ❑ Is in a Separate Green Folder(join with this folder for permit issuance) <br /> Approved By: Date: ❑ Will be Issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> ❑ Public Works has no scope on this permit--- PW Not Required <br /> ELECTRICAL/PLUMBING Additional Notes: <br /> Additional Notes: <br /> Approved By: Date: Completed By: Date: <br />