Laserfiche WebLink
I. BUILDING PLANS <br /> A. Summary of the floor area under the scope of permit,the occupancies, construction type, and occupant <br /> loads. New or change of occupancy permits have additional requirements. <br /> B. Applicable codes and identification of existing or new fire suppression system type or fire alarm system. <br /> C. Compliance with the International Existing Building Code path should be identified in the code <br /> analysis to be prescriptive, work area, or performance compliance method. Retroactive code <br /> requirements may be triggered,to include shaft enclosures, accessibility, seismic analysis, and <br /> energy code compliance. <br /> D. Architect's stamp, currently licensed by the State of Washington, per RCW 18.08.410 or RCW 64.55 <br /> for the following permit applications: <br /> • The change of occupancy or residential tenant improvement includes more than four dwelling units, <br /> including auxiliary buildings; or, <br /> • The simultaneous project size exceeds four thousand square feet; or, <br /> • The work affects the life safety or structural systems of the building; or, <br /> • The building enclosure revisions for a building with more than two dwelling units exceeds 5%of the <br /> Snohomish County assessed market improvement value. Alternatively,a Snohomish County certified <br /> sales prohibition covenant can be submitted with the plans. <br /> E. Structural engineering stamp for significant structures (RCW 18.43.040). <br /> F. Foundation plans and details. <br /> G. Floor plan with complete dimensions. Indicate the proposed use of each space. Show all exit doors, <br /> stairs, corridors, etc. <br /> H. Building section with vertical dimensions and building construction details. <br /> I. Wall sections indicating proposed construction and assembly ratings as required for occupancy <br /> separation, area separation or building construction. <br /> J. All exterior elevations, indicating proposed materials,finish grade, and building height. <br /> K. Stair or ramp plans (1/4" = 1' minimum scale) and sections, guards, and handrails. <br /> L. Toilet room plans (1/4" = 1' minimum scale) and interior elevations, indicate wall and floor finishes, <br /> fixture dimensions, accessible hardware (if required)and toilet accessories. <br /> M. Schedules: door, window, room finish and hardware. <br /> N. Lighting plan and energy budget calculations (indicate wattage of all fixtures, include exterior <br /> building mounted lighting) submitted with permit application. <br /> O. Northwest Energy Efficiency Council Worksheets to show compliance with Washington State Energy <br /> Code, including drawing details and summary of enclosure requirements. <br /> P. Structural drawings and calculations to include design loads, material specifications and structural <br /> schedules, including seismic analysis, if applicable. <br /> Q. Copies of any permits/approvals issued by the Planning Department. <br /> R. High-piled combustible storage (if applicable). Plans and specifications submittal per Chapter 23, <br /> Section 2301.3, IFC. <br /> 3200 Cedar Street © 425.257.8810 O everetteps@everettwa.gov <br /> Everett, WA 98201 425.257.8857 fax everettwa.gov/permits <br /> Commercial Construction Submittal Checklist(2019) Page 2 of 4 <br />