My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington State Department of Ecology 7/21/2025
>
Contracts
>
Agreement
>
Grant Agreement (City as Grantee)
>
Washington State Department of Ecology 7/21/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 9:02:54 AM
Creation date
7/22/2025 9:01:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington State Department of Ecology
Approval Date
7/21/2025
Council Approval Date
7/16/2025
End Date
1/31/2027
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lenora Regional Stormwater Facility
Tracking Number
0004918
Total Compensation
$8,733,920.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Agreement No. WQC-2025-EverPW-00177 <br />WATER QUALITY COMBINED FINANCIAL ASSISTANCE AGREEMENT <br />BETWEEN <br />THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY <br />AND <br />CITY OF EVERETT <br />This is a binding Agreement entered into by and between the state of Washington , Department of Ecology, hereinafter <br />referred to as “ECOLOGY,” and City of Everett, hereinafter referred to as the “RECIPIENT,” to carry out with the <br />provided funds activities described herein. <br />Lenora Regional Stormwater Facility <br />GENERAL INFORMATION <br />Project Title: <br />Total Cost: <br />Total Eligible Cost: <br />Ecology Share: <br />Recipient Share: <br />The Effective Date of this Agreement is: <br />The Expiration Date of this Agreement is no later than: <br />Project Type: <br />Project Short Description: <br />This project will improve water quality in the Snohomish River through installation of a Filterra Bioscape system at the <br />east end of Lenora Street in the City of Everett. This project will provide treatment for total suspended solids (TSS), oil <br />(total petroleum hydrocarbons), dissolved copper and zinc, and total phosphorus. <br />Project Long Description: <br />This project is the first of three phases that, when complete, will treat stormwater from a 258.4-acre contributing area <br />before it enters the Snohomish River. ECOLOGY reviewed and accepted the Design Report and 90% Design Package <br />for all phases under grant WQC-2019-EverPW-00051. The Snohomish River is not on Washington’s 303(d) List, but <br />provides important habitat for salmonid spawning, rearing, and migration. <br />The RECIPIENT will complete the first phase of construction which includes a five -cell Filterra Bioscape system with <br />$11,085,400.00 <br />$10,275,200.00 <br />$8,733,920.00 <br />$1,541,280.00 <br />07/01/2024 <br />01/31/2027 <br />Stormwater Facility <br />Docusign Envelope ID: 6F838448-F93E-4047-9A6A-F21A7AAB2AE6
The URL can be used to link to this page
Your browser does not support the video tag.