My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington State Department of Ecology 7/21/2025
>
Contracts
>
Agreement
>
Grant Agreement (City as Grantee)
>
Washington State Department of Ecology 7/21/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 9:02:54 AM
Creation date
7/22/2025 9:01:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington State Department of Ecology
Approval Date
7/21/2025
Council Approval Date
7/16/2025
End Date
1/31/2027
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lenora Regional Stormwater Facility
Tracking Number
0004918
Total Compensation
$8,733,920.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 12 of 45State of Washington Department of Ecology <br />Agreement No: <br />Project Title: <br />Recipient Name: <br />WQC-2025-EverPW-00177 <br />Lenora Regional Stormwater Facility <br />City of Everett <br />Deliverables <br />Design Plans and Specifications <br />Number Description Due Date <br />3.1 Signed and dated consultant contract, if procuring services for design. The <br />contract must include ECOLOGY’s standard contract clauses and /or <br />specification insert. <br />Upload to EAGL and notify ECOLOGY. <br />3.2 Design Report. <br />Upload to EAGL and notify ECOLOGY. <br />3.3 Responses to ECOLOGY Design Report comments . <br />Upload to EAGL and notify ECOLOGY. <br />3.4 ECOLOGY Design Report Acceptance Letter . <br />Upload to EAGL and notify ECOLOGY. <br />3.5 90 Percent Design Package. <br />Upload to EAGL and notify ECOLOGY. <br />3.6 Responses to ECOLOGY 90 Percent Design Package comments. <br />Upload to EAGL and notify ECOLOGY. <br />3.7 ECOLOGY 90 Percent Design Acceptance Letter . <br />Upload to EAGL and notify ECOLOGY. <br />3.8 Preliminary project shapefiles, file geodatabase feature classes, shared feature <br />services, or ECOLOGY-accepted equivalent. <br />Upload to EAGL and notify ECOLOGY. <br />3.9 Final Bid Package. <br />Upload to EAGL and notify ECOLOGY. <br />3.10 Responses to ECOLOGY Final Bid Package comments. <br />Upload to EAGL and notify ECOLOGY. <br />3.11 Ecology Final Bid Package Acceptance Letter. <br />Upload to EAGL and notify ECOLOGY. <br />3.12 Bid Documents (e.g. bid announcement, bid tabulations, and bid award). <br />Upload to EAGL and notify ECOLOGY. <br />Template Version 12/10/2020 <br />Docusign Envelope ID: 6F838448-F93E-4047-9A6A-F21A7AAB2AE6
The URL can be used to link to this page
Your browser does not support the video tag.