My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1013 RUCKER AVE 2025-08-20
>
Address Records
>
RUCKER AVE
>
1013
>
1013 RUCKER AVE 2025-08-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 8:53:48 AM
Creation date
7/22/2025 10:02:32 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
1013
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 9/6/2024 9/6/2024 BLDG 07-EXTERIOR I RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> SHEAR REQUIRED <br /> Notes: <br /> 9/2/2024 8:36 PM Tyler Levin <br /> Contact Name:Tyler Levin <br /> Site Address:1013 Rucker Ave <br /> Phone:4258709023 <br /> e-Mail:tlevin40@yahoo.com <br /> Upload engineer letter,and drawing to permit regarding revisions to door location. Post installed hold downs,require special inspection.Drawings <br /> specify 5/8 inch anchor bolts,but half-inch were installed.Missing anchor bolts at edge of sill. Missing nuts on some anchor bolts.Front shear walls at <br /> garage door require 4 inch nailing. <br /> BLDG <br /> 9/6/2024 9/6/2024 G 08 FRAMING RAKEEB KHAN NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 9/2/2024 8:36 PM Tyler Levin <br /> Contact Name:Tyler Levin <br /> Site Address:1013 Rucker Ave <br /> Phone:4258709023 <br /> e-Mail:tlevin40@yahoo.com <br /> Did not perform inspection.Not ready.Need sub permit rough in approval prior to framing. <br /> 9/10/2024 9/10/2024 BLDG 01 RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> CONSULTATION REQUIRED <br /> Notes: <br /> 9/9/2024 2:04 PM Tyler Levin <br /> Contact Name:Tyler Levin <br /> Site Address:1013 Rucker Ave <br /> Phone:4258709023 <br /> e-Mail:tlevin40@yahoo.com <br /> Discussed hold down locations and corrections required to install hold downs.Special inspection required.Missing floor framing above the stairs where <br /> hdu8 is specified. <br /> 9/13/2024 9/13/2024 BLDG 01- RAKEEB KHAN OTHER eTRAKiT Inspection Request <br /> CONSULTATION <br /> Notes: <br /> 9/11/2024 9:54 AM Tyler Levin <br /> Short visit to review work completed that we discussed on 9/10. <br /> Contact Name:Tyler Levin <br /> Site Address:1013 Rucker Ave <br /> Phone:4258709023 <br /> e-Mail:tlevin40@yahoo.com <br /> Discussed hold down location and framing requirements for holdown. <br /> I <br /> Printed:Wednesday, 29 January,2025 3 of 5 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.