My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9501 19TH AVE SE BLOOM COFFEE BAR 2025-08-20
>
Address Records
>
19TH AVE SE
>
9501
>
BLOOM COFFEE BAR
>
9501 19TH AVE SE BLOOM COFFEE BAR 2025-08-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 11:24:05 AM
Creation date
7/22/2025 1:39:57 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9501
Tenant Name
BLOOM COFFEE BAR
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thad Newport <br /> From: Thad Newport <br /> Sent: Wednesday, September 20, 2023 1:34 PM <br /> To: russ.cks@gmail.com <br /> Cc: Pretreatment; Michael Brick <br /> Subject: B2306-OS4 9SO1 19TH AVE SE - Public Works Comments <br /> Attachments: Handout-Permit Application Submittal and Re-submittal Instructions.pdf <br /> Category 2:Sensitive information <br /> Hello, <br /> I am working on the Public Works review of the proposed coffee stand at 9501 19th AVE SE. Please see the correction <br /> items listed below and resubmit a 2 copies of the revised plans along with a transmittal sheet at your convenience for <br /> additional review. <br /> 1. Will the proposed coffee stand have connections to the water and sewer utilities? If yes, is a separate water <br /> meter required or will it share the water from the service/gas station? Please proposed utility connections on <br /> the revised site plan. <br /> 2. Will the coffee stand have a 3-compartment sink?Additional grease control requirements may be required if the <br /> coffee stand is designated as a Food Service Establishment.See EMC 14.42. For additional information please <br /> contact Industrial Pre Treatment at pretreatment@everettwa.gov. <br /> 3. The location of the coffee stand and the potential for queued cars will effectively block the exit lane of the gas <br /> station to 19th AVE SE. Please provide a revised site plan/traffic management plan/channelization plan showing <br /> how the flow of traffic will be managed/directed. For additional information please contact Michael Brick in our <br /> Traffic Engineering Dept. at MBrick@everettwa.gov. <br /> 4. The site plan provided with the sign permit shows 45ft-6in from 191h AVE SE to the front of the stand. Where is <br /> this dimension taken from on the street? <br />
The URL can be used to link to this page
Your browser does not support the video tag.