Laserfiche WebLink
May 28, 2010 Sprinker 13i <br /> STANDARD RESPONSE <br /> ELO UPRIGHT AND <br /> PENDENT SPRINKLERS I I a:N:G:*: (STORAGE-DENSITY/AREA) <br /> The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058 <br /> Telephone: 269-945-9501 Technical Services: 877-384-5464 Fax: 269-818-1680 Email: techsvcs@vikingcorp.com <br /> Approval Chart 2 (FM) Temperature KEY <br /> Standard Response Extra-Large Orifice Upright and Pendent Sprinklers��Finish <br /> Maximum 175 PSI (12 Bar)WWP <br /> A1Xf Escutcheon(if applicable) <br /> Base Pant Thread Size Nominal K-Factor Overall Length FM Approvals' <br /> Number' SIN Sprinkler Style also to Design Criteria below. <br /> NPT BSP U.S. metrics Inches mm (Refer 9 ) <br /> 09679 VK530 Upright 3/4" 11.2 161.3 2-5/16 58.7 A2 <br /> 14819 VK530 Upright - 20 mm 11.2 161.3 2-5/16 58.7 A2 <br /> 07961 VK536 Pendent 3/4" 11.2 161.3 2-5/16 58.7 A1X <br /> 14820 VK536 Pendent - 20 mm 11.2 161.3 1 2-5/16 58.7 A1X <br /> Approved Temperature Ratings Approved Finishes <br /> Escutcheons <br /> A- 155°F(68°C), 175°F(79°C), 200°F(93°C),and 286°F 1 -Brass X-Standard surface-mounted escutcheons <br /> (141 °C) 2-Brass and Chrome-Enloy® <br /> Footnotes <br /> Base part number shown. For complete part number, refer to Viking's current price schedule. <br /> 2 Metric K-factor measurement shown is when pressure is measured in Bar.When pressure is measured in kPa,divide the metric K-factor shown by 10.0. <br /> 3This table shows the FM Approvals available at the time of printing. Other approvals may be in process. <br /> DESIGN CRITERIA - FM <br /> Also refer to Approval Chart 2 above.) <br /> FM Approval Reauirements: <br /> Standard Response Extra-Large Orifice Upright Sprinkler VK530 and Pendent Sprinkler VK536 are FM Approved as standard response upright and <br /> pendent Non-Storage sprinklers, and as a standard response upright and pendent Storage sprinklers as indicated in the FM Approval Guide. For <br /> specific application and installation requirements, reference the latest applicable FM Loss Prevention Data Sheets(including 2-0 and 8-9). FM Global <br /> Loss Prevention Data Sheets contain guidelines relating to, but not limited to: minimum water supply requirements, hydraulic design,ceiling slope and <br /> obstructions, minimum and maximum allowable spacing,and deflector distance below the ceiling. <br /> NOTE:The FM installation guidelines may differ from cULus and/or NFPA criteria. <br /> IMPORTANT. Always refer to Bulletin Form No. F_091699 - Care and Handling of Sprinklers. Also refer to pages <br /> SR1-3 for general care, installation, and maintenance information. Viking sprinklers are to be installed in ac- <br /> cordance with the latest edition of Viking technical data, the appropriate standards of NFPA, FM Global, LPCB, <br /> APSAD,VdS or other similar organizations, and also with the provisions of governmental codes, ordinances, and <br /> standards, whenever applicable. <br />