Laserfiche WebLink
BELLS <br /> (E) POTTER PBA-AC & PBD-DC <br /> The Symbol of Protection <br /> DIMENSIONS <br /> INCHES(mm) <br /> FIG. 1 BELLS FIG. 2 WEATHERPROOF BACKBOX <br /> BOX HAS ONETHREADED 1/2"CONDUIT ENTRANCE <br /> 10, <br /> (2 0) r-�-1- 5 3/4" O - 3 3/8" 5„ <br /> 8 (146) (86) (127) <br /> (200) 6" <br /> (150) <br /> 7T—� <br /> 3 3/8" <br /> (86) <br /> (41) 4 1/4 <br /> (68) " <br /> 2 DWG, #776-1 (108) <br /> (68) <br /> DWG. #776-2 <br /> FIG. 3 WIRING (REAR VIEW) <br /> D.C. BELLS (OBSERVE POLARITY) A.C. BELLS <br /> REO (IN) RED (OUT) WHITE (IN) WHITE (OUT) <br /> 0 0 <br /> FROM CONTROL PANEL TO NEXT BELL FROM CONTROL PANEL <br /> OR OR END-OF-LINE OR <br /> PRECEDING BELL RESISTOR PRECEDING BELL <br /> BLACK (IN) BLACK (OUT) BLACK (IN) BLACK (OUT) <br /> CAUTION: CAUTION; <br /> WHEN ELECTRICAL SUPERVISION IS REQUIRED USE IN AND OUT LEADS AS SHOWN. WHEN ELECTRICAL SUPERVISION IS REQUIRED USE IN AND OUT LEADS AS SHOWN_ <br /> NOTES: NOTES: <br /> 1, OBSERVE POLARITY TO RING D,C. BELLS, 1. WHEN USING A-C. BELLS, TERMINATE EACH EXTRA WIRE SEPARATELY <br /> 2, RED WIRES POSITIVE (+) AFTER LAST BELL_ <br /> 3, BLACK WIRES NEGATIVE (-) 2, END-OF-LINE RESISTOR IS NOT REQUIRED ON A,C. BELLS, <br /> DWG. #776-3 <br /> INSTALLATION <br /> 1. The bell should be mounted a minimum of 8 ft. (2,4m)from the floor or as close to the ceiling as possible. <br /> 2. Remove the gong. <br /> 3. Connect wiring(see Fig.3). <br /> 4. Mount bell mechanism to backbox(bell mechanism must be mounted with the striker pointing down). <br /> 5. Reinstall the gong (be sure that the gong positioning pin, in the mechanism housing, is in the hole in the gong). <br /> 6. Test all bells for proper operation and observe that they can be heard where required(bells must be heard in all areas <br /> as designated by the authority having jurisdiction). <br /> PRINTED IN USA MKT.#8850001-REV Q PAGE 2 OF 2 <br /> MFG.#5400776-12/01 <br />