<br />4 <br /> <br />2. All explorations for this scope amendment can be completed within an 8-hour day during <br />daylight hours and will be within City Right of Way or property for which right of entry has <br />already been secured. <br /> <br />Deliverables <br />The following deliverables will be produced under Task 300: <br />1. Draft and Final Dewatering memorandum <br />2. Final geotechnical report <br />Task 500 Project Reports <br />Objective <br />Ecology’s review process required multiple iterations of the design report in the form of <br />amendments. Those amendments were separate documents to facilitate expediting Ecology <br />review. The objective of Task 500 is to assemble the amendments into a final report for use by <br />the City. <br />Subtask 510 Design Report Update <br />Consultant Services <br />The Consultant will provide the following services under Subtask 510: <br />1. Summarize the changes that were incorporated into the final design through the value <br />engineering process that was completed in a memorandum to Ecology. Support the City in <br />responding to comments that may arise from that summary. <br />2. Assemble a final design report that incorporates the final design and each of the <br />amendments that were developed to meet Ecology grant requirements. <br />City Responsibilities <br />The City is responsible for the following activities under Task 500: <br />1. Provide written consolidated, conflict-resolved comments for the draft final design report. <br />Assumptions <br />The following was assumed for Task 500: <br />1. The report will not undergo Ecology review <br />Deliverables <br />The following deliverables will be produced under Task 500: <br />1. Draft and final design report