Laserfiche WebLink
Contents <br /> 1.0 Introduction 1 <br /> 2.0 Site Description 3 <br /> 2.1 Existing Conditions 3 <br /> 2.2 Proposed Construction Activities 3 <br /> 3.0 Construction Stormwater BMPs 5 <br /> 3.1 The 12 BMP Elements 5 <br /> 3.1.1 Element#1 —Mark Clearing Limits 5 <br /> 3.1.2 Element#2—Establish Construction Access 5 <br /> 3.1.3 Element#3—Control Flow Rates 6 <br /> 3.1.4 Element#4—Install Sediment Controls 6 <br /> 3.1.5 Element#5—Stabilize Soils 6 <br /> 3.1.6 Element#6—Protect Slopes 7 <br /> 3.1.7 Element #7—Protect Drain Inlets 7 <br /> 3.1.8 Element #8—Stabilize Channels and Outlets 8 <br /> 3.1.9 Element#9—Control Pollutants 8 <br /> 3.1.10 Element#10—Control Dewatering 9 <br /> 3.1.11 Element #11 —Maintain BMPs 9 <br /> 3.1.12 Element #12—Manage the Project 9 <br /> 3.2 Site Specific BMPs 12 <br /> 4.0 Construction Phasing and BMP Implementation 13 <br /> 5.0 Pollution Prevention Team 15 <br /> 5.1 Roles and Responsibilities 15 <br /> 5.2 Team Members 16 <br /> 6.0 Site Inspections and Monitoring 17 <br /> 6.1 Site Inspection 17 <br /> 6.1.1 Site Inspection Frequency 17 <br /> 6.1.2 Site Inspection Documentation 18 <br /> 6.2 Stormwater Quality Monitoring 18 <br /> 6.2.1 Turbidity Sampling 18 <br /> 6.2.2 pH Sampling 19 <br /> 7.0 Reporting and Recordkeeping 20 <br /> 7.1 Recordkeeping 20 <br /> 7.1.1 Site Log Book 20 <br /> 7.1.2 Records Retention 20 <br /> 7.1.3 Access to Plans and Records 20 <br /> 7.1.4 Updating the SWPPP 20 <br /> ii <br />