Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> Coordination with Utilities and Other Jurisdictions <br /> • Care has been taken to coordinate with utilities, other construction <br /> projects, and the local jurisdiction in preparing this SWPPP and <br /> scheduling the construction work. <br /> Inspection and Monitoring <br /> • All BMPs shall be inspected, maintained, and repaired as needed to <br /> assure continued performance of their intended function. Site <br /> inspections shall be conducted by a person who is knowledgeable in the <br /> principles and practices of erosion and sediment control. This person <br /> has the necessary skills to: <br /> ❑ Assess the site conditions and construction activities that could <br /> impact the quality of stormwater, and <br /> ❑ Assess the effectiveness of erosion and sediment control measures <br /> used to control the quality of stormwater discharges. <br /> • A Certified Erosion and Sediment Control Lead shall be on-site or on- <br /> call at all times. <br /> • Whenever inspection and/or monitoring reveals that the BMPs identified <br /> in this SWPPP are inadequate, due to the actual discharge of or potential <br /> to discharge a significant amount of any pollutant, appropriate BMPs or <br /> design changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP <br /> • This SWPPP shall be retained on-site or within reasonable access to the <br /> site. <br /> • The SWPPP shall be modified whenever there is a change in the design, <br /> construction, operation, or maintenance at the construction site that has, <br /> or could have, a significant effect on the discharge of pollutants to <br /> waters of the state. <br /> • The SWPPP shall be modified if, during inspections or investigations <br /> conducted by the owner/operator, or the applicable local or state <br /> regulatory authority, it is determined that the SWPPP is ineffective in <br /> eliminating or significantly minimizing pollutants in stormwater <br /> discharges from the site. The SWPPP shall be modified as necessary to <br /> include additional or modified BMPs designed to correct problems <br /> 11 <br />