My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11517 AIRPORT RD 2025-07-24
>
Address Records
>
AIRPORT RD
>
11517
>
11517 AIRPORT RD 2025-07-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2025 2:37:41 PM
Creation date
7/24/2025 1:54:10 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11517
Notes
STORMWATER SITE PLAN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> Coordination with Utilities and Other Jurisdictions <br /> • Care has been taken to coordinate with utilities, other construction <br /> projects, and the local jurisdiction in preparing this SWPPP and <br /> scheduling the construction work. <br /> Inspection and Monitoring <br /> • All BMPs shall be inspected, maintained, and repaired as needed to <br /> assure continued performance of their intended function. Site <br /> inspections shall be conducted by a person who is knowledgeable in the <br /> principles and practices of erosion and sediment control. This person <br /> has the necessary skills to: <br /> ❑ Assess the site conditions and construction activities that could <br /> impact the quality of stormwater, and <br /> ❑ Assess the effectiveness of erosion and sediment control measures <br /> used to control the quality of stormwater discharges. <br /> • A Certified Erosion and Sediment Control Lead shall be on-site or on- <br /> call at all times. <br /> • Whenever inspection and/or monitoring reveals that the BMPs identified <br /> in this SWPPP are inadequate, due to the actual discharge of or potential <br /> to discharge a significant amount of any pollutant, appropriate BMPs or <br /> design changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP <br /> • This SWPPP shall be retained on-site or within reasonable access to the <br /> site. <br /> • The SWPPP shall be modified whenever there is a change in the design, <br /> construction, operation, or maintenance at the construction site that has, <br /> or could have, a significant effect on the discharge of pollutants to <br /> waters of the state. <br /> • The SWPPP shall be modified if, during inspections or investigations <br /> conducted by the owner/operator, or the applicable local or state <br /> regulatory authority, it is determined that the SWPPP is ineffective in <br /> eliminating or significantly minimizing pollutants in stormwater <br /> discharges from the site. The SWPPP shall be modified as necessary to <br /> include additional or modified BMPs designed to correct problems <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.