Stormwater Pollution Prevention Plan <br /> 4.0 Construction Phasing and BMP <br /> Implementation <br /> The BMP implementation schedule will be driven by the construction schedule. The following <br /> provides a sequential list of the proposed construction schedule milestones and the corresponding <br /> BMP implementation schedule. The list contains key milestones such as wet season <br /> construction. <br /> The BMP implementation schedule listed below is keyed to proposed phases of the construction <br /> project, and reflects differences in BMP installations and inspections that relate to wet season <br /> construction. The project site is located west of the Cascade Mountain Crest. As such, the dry <br /> season is considered to be from May 1 to September 30 and the wet season is considered to be <br /> from October 1 to April 30. <br /> • Mark Clearing Limits: June 2012 <br /> • Install ESC measures: June 2012 <br /> • Install stabilized construction entrance: June 2012 <br /> • Begin clearing and grubbing: July 2012 <br /> • Stabilize Soils: Sept. 2012 to Sept.2013 <br /> • Protect Slopes: Sept.2012 to Sept. 2013 <br /> • Stabilized Site: Sept.2013 <br /> The construction sequence for this project is as outlined in the TESC Plan Sheets and Details in <br /> Appendix A. The project is likely to be constructed under a single phase, however,the <br /> contractor is encouraged to phase the project as much as is feasible, making sure to stabilize <br /> portions of the site that are to be unworked for significant periods of time. <br /> A construction schedule has not yet been established. The owner and contractor shall discuss the <br /> project schedule with the City at or before the preconstruction conference to determine the best <br /> way to mitigate any wet-season construction concerns. <br /> 13 <br />