Laserfiche WebLink
• <br /> Stormwater Pollution Prevention Plan <br /> of pollutants to the waters of the State. The SWPPP will be modified within seven days of <br /> determination based on inspection(s)that additional or modified BMPs are necessary to correct <br /> problems identified, and an updated timeline for BMP implementation will be prepared. <br /> 7.2 Reporting <br /> 7.2.1 Discharge Monitoring Reports <br /> Discharge Monitoring Report (DMR) forms will not be submitted to Ecology because water <br /> quality sampling is not being conducted at the site. <br /> 7.2.2 Notification of Noncompliance <br /> If any of the terms and conditions of the permit are not met, and it causes a threat to human <br /> health or the environment, the following steps will be taken in accordance with permit section <br /> S5.F: <br /> 1. Ecology will be immediately notified of the failure to comply. <br /> 2. Immediate action will be taken to control the noncompliance issue and to <br /> correct the problem. If applicable, sampling and analysis of any <br /> noncompliance will be repeated immediately and the results submitted to <br /> Ecology within five (5) days of becoming aware of the violation. <br /> 3. A detailed written report describing the noncompliance will be submitted <br /> to Ecology within five (5) days, unless requested earlier by Ecology. <br /> In accordance with permit condition S2.A, a complete application form will be submitted to <br /> Ecology and the appropriate local jurisdiction(if applicable)to be covered by the General <br /> Permit. <br /> 21 <br />